          Fan type cooling towers are installed at Patratu Thermal Power Station. The purpose of cooling tower is to cool the circulating water, which is heated in condensers by exhaust steam of turbines.
          One cooling tower (from 1-4) is designed for unit rate of 50MW capacity and cooling tower number 5 and 6 are designed for 100MW capacity units.
Cooling towers are equipped with fans of induced type, designated for operation under conditions of tropical climate. Fans give air steam by means of which the circulating water is cooed. For better contact of air with water and for more effective heat transfer, water coming from condensers of steam turbine is distributed uniformly in cross-section of cooling tower, sprayed by means of special devices and flows down to basin in separate small jets.
          Between fan and level of water of supply water of supply water to be cooled, there are wooden nets, which change the direction of air steam and considerable carryover of water drops by air steam. Evaporation of water in cooling tower is about 2% of the water flow of closed circulating system condenser cooling tower. Carry over of water from cooling tower is approximately equal to 1% of the water flow of the above system.
Area of spraying of one cooling tower- 1200 sq. mts.
Capacity of one cooling tower- 7730 cu.mts./hr.
Temperature drop- 9.80C
Density of spraying- 6.45M/V

          Cooling tower having density of spraying 6.45M/V and outside air temperature 32.20C measured by wt thermometer provides cooling of water up to a temperature of 36.50C.
          If the flow of water through condenser is equal to 800 cu. Mt./hr. and water temperature is 36.50C, the turbine may operate with rated power if parameters of steam are not less than the rated ones.




Cooling tower consists of six right angled sections with size of 12m. X 18m. in axis and square of 200m. each.

Cooling tower includes underground part consisting of water basin and overhead part consists of frame, fencing, structure, sprayer, with water distribution devices and ventilation fan installation. Water basin is common for all the six sections and is made of monolithic reinforced concrete. At the place of water, branching from basing to gravity channel, there is a well with two rowed grooves for installation of cleaning screens. For discharge and overflow, the basin is equipped with pipelines, which are connected to the mains of industrial storm water sewerage. Water supply to each section is effected from common distribution header through separate pipes with shut-off gate valves, which enable to stop any of the sections of cooling tower for inspection or repair. Exhaust fans are located in the center of each section. Outside casing of cooling tower and sparing device are made of separate sheets of corrugated asbestos sheet. 

Comments

Popular posts from this blog

HIGH VOLTAGE TEST TECHNIQUES - Research Paper

Abstract: In this paper we have dealt with the high voltages testing techniques and High voltage measurement techniques.Different techniques like Chubb-Fortescue Method and Peak value measurement are also explained in detail. The method of measurement of voltage with the help of Sphere Gap and Construction of Sphere Gap and its Effects of earthed objects and atmospheric conditions on the accuracy of measurement are explained in details.Other techniques like Principle of measurement of voltage by Electrostatic Voltmeters and its Construction of Electrostatic Voltmetres help in study of High Voltages. Principle of Potential Dividers And types of potential dividers circuit are also covered in this paper. High test voltages generated in laboratories require special techniques for their measurement. Each type of high voltage namely; ac (), dc (=) and impulse () can be suitably measured with more than one different techniques. The choice of the method of measurement in a laboratory is ...