INTRODUCTION
Necessity of the power plant.
“Power
to progress”
Energy
provides the power to progress. The natural resources of a country may be large
but they can be turned into wealth if they are developed, used and exchanged
for the other goods. This cannot be achieved without energy. Availability of
sufficient energy and its proper use in any country can results in its people
rising from substantial level to the highest standard of living.
It has
been found that countries whose national output is mainly agricultural and
whose population lives mostly in rural communities enjoy low per capita growth
of energy consumption is dependent is the extent to which industrial activity
forms a part of its energy usage undergoes a distinct change. Once energy is
made available in excess of domestic needs it has been found that it is not
used solely as a consumer good but becomes a factor of production.
Demand of Electricity
A
growing proportion of energy is being met all over the world in the form of electricity.
This trend will further be stimulated because of increasing availability of
clean electricity. This applies especially to development countries because
their industrial progress will be based on modern technologies, which generally
use electricity intensively.
Establishment of Power
Plant:-
To meet
the above mentioned demand of electricity Patratu
Thermal Power Station was established (previously Bihar )
in Jharkhand. This was authorized in the later part “Heavy Engineering
Corporation”, Ranchi , which at that time was
one of the biggest production plants in Asia .
P.T.P.S. has four units of 50 MW each capacity and
two units of 100 MW capacity each (Russian Side). All the equipment of the
power station ordered under the trade agreement with V/0 Machine export USSR . The design of the power station has
been prepared by the “Jeploebeiro
Production Design Organization of the Thermal Power Station” in the USSR in consultation with “Bihar
state Electricity Board”. Initial installation capacity of P.T.P.S. was 400 MW.
Latter, to meet the growing power demand of the state the Indian Government
installed four units of 110 MW each (normal Indian Site-1). So the total
capacity in now 840 MW.
Location and Topography:-
Patratu
Thermal Power Station is situated near the coal belt of south karakpura in the
district of Hazaribagh at the distance of 4 km from Patratu railway Station on
Barkakana-Barwadhi railway line. The plant site is 35 km from Ramgarh, 45 km
from Ranchi and
87 km from central hazaribagh. The Power plant is connected by railway station,
which comes under central eastern railway zone. The road and air from all
important cities of the country.
The
average level of the site above the mean sea level is 372.5 m. the site is on
the left bank of Nalkari river which is a tributary of Damodar river. A dam on
the upstream site of the nalkari requirement of water. The departments of
industry of the Govt. of Bihar have selected a area nearby on the right bank of
nalkari river for establishing industries. It is an ideal site for setting up
industries.
Climatic condition:-
The
site is situated in the zone of humid climate. Some important meteorological
datas are:
Maximum ambient temperature is 46.30C
Average annual wet bulb amb. Temp. is 20.20C
Maximum humidity is 87%
Average annual rainfall is 50 inches.
Mostly
the wind direction is western & non western.
General
wind velocity at 10m height is 45m/s
Area acquired by P.T.P.S.:-
Area
of 4155 acres land on the left bank of Nalkari river has been acquired for
Power Station, accommodation for staff and other uses. Additional land of 628
acres for ash disposal on the right bank is also in use.
Constructional Details:-
The
whole plant is mainly divided into five parts: water treatment plant, coal
handling unit, steam generator, steam turbine and switch yard, in addition to
these cooling towers are also provided. The administrative block is situated
just beside the plant.
Plant Details:-
Four
units of 50 MW(Russian) each having one boiler and two 100 MW (Russian) units
each having two boiler run in parallel. There is provision to run 100 MW units
at around 50%, capacity with one boiler in service. Also there are four unite
of 110 MW (Indian) having one boiler each. The 50 MW unite have single cylinder
turbine, 100 MW units have double cylinders but 110 MW units have three
cylinders with arrangement for reheating the steam. The turbines and boilers
are installed in conventional system i.e. one boiler is connected to its own turbine
and there is no provision of another interconnected in boilers and turbines.
There is one chimney for exhausting the flue gases for four 50 MW each and one
chimney for two 100 MW each (Russian). Another two chimneys for four (110 MW
each) Indian boilers (one for two boilers). Thus, there are four chimneys at
all having 120m height.
Steam
is generated at high pressure and temperature in the Boilers, which is utilized
to run the turbine at a high speed (3000 rpm). Electric generator is coupled with
the turbine and is rotated by the turbine at the same speed, which result in
generating power. (as magnetized rotor of generator rotates inside the stator
coils.)
Power
is generated at 10.5 KV which is then stepped up to 132 KV in 50 MW units and
10.5 KV/220 KV in 2 X 100MW units of Russian Plant. Power is generated at 11 KV
which is then stepped up to 220 KV. Then these through an autotransformer.
FUEL
OF POWER STATION
1.
Oil :- It is used during standing period to achieve coal
Combustion temp.
Two
types of oil are used:-
(a) L.D.O.
(light diesel oil).
(b) F.O. (furnace
oil).
Properties of L.D.O.:-
(1) Flash point =
660C
(2) C.V. =
10,000 Cal/Kg
Properties of F.O:-
(1) Flash point =
1150C
(2) C.V. =
10,000 Cal/Kg
2.
Coal:-
Coal
is the main fuel used in power house having following proportion:
(1) C.V. =
3610 to 4300 Cal/Kg, 4700 Cal/Kg
(2) Moisture contains 10% to 11%
(3) Sulpher =
00 to 0.40%
(4) Valatyle motter = 20.5% to 34%
(5) fixed carbon = 29.6% to 34%
(6) size =
0 to 10/20 mm
(7) Ash deformation temp. = 12000C
(8) Ash fusion temp. = 13500C
SALIENT DATA
RUSSIAN UNITS (4 X 50 + 2 X 100) MW
(a)
High pressure steam generator (Boiler)
Supplier V/O
Machine Export USSR
Type Type
T – 155
Radiant
Single drum water
Tube
pulverized coal fired boiler.
Rated Output 220
tone/hour
Working pressure 100
atm.
Feed water temp. 2150C
Superheated steam temp. 5400C
(b) Steam Turbine 50MW 100MW
Supplier V/O
Export, V/O Export,
Type K – 50-90 k – 100-90
Casing Cylinder unit single double
Rated Speed 3000
rpm 3000 rpm
Rated Steam pre. 90
atm. 90 atm.
Rated Steam temp. 5350C 5350C
Rated cooling water 270C 270C
Temperature
(c) Turbo Generator: - 50MW 100MW
Supplier V/O Export V/O Export
Type TB-602 T TB-1002 T’
Casing
cylinder unit single double
Rated active
power 50 MW 100 MW
Rated
generated 10.5 KV=5% 10.5 KV=5%
Rated power
factor 0.8 lagging 0.8 lagging
Speed 3000 rpm 3000rpm
Frequency 50 Hz 50 Hz
BHEL UNITS (4x110 MW)
(a)
Boilers:
Manufacturer /
Supplier BHEL Tiruchirapalli, Tamil
Nadu,
Radiant, Single drum water tube,
Dry bottom, Pulverized coal fired
Boilers.
Rated output 380 tones/hour
Working
pressure 139 atm
Feed water
Temp. 2400C
Superheated
steam temp. 5400C=5C
(b)
Steam Turbine :-
Manufacture/Supplier NHEL, Hyderabad
Type Three casing, condensing steam
With
Reheating.;
Rated Speed 3000 rpm
Rated steam
Temp. 5350C
Rated cooling
water temp. 300C
(c)
Turbo Generator:-
Manufacturer/Supplier
BHEL, Hyderabad
Type IGH-30.2
Rated active power 110 MW
Rated
generated Voltage 11 KV ± 5%
Rated Current 6560 Amp.
Rated Factor 0.83 lagging
Speed 3000
rpm
Frequency 50 Hz
COAL HANDLING PLANT
There are wide spread belt
conveyor system to feed the raw coal bunkers of the various boilers. The entire
plant consists of three wagon tippler, two crusher hones and a system of
conveyor belts. The plant constructed with extension stage 1 & 2 provided
one wagon and a crusher house having two crushers of capacity 600 tones/hour
each. The plant has been extended with another wagon tifuly and a crusher house
and an additional conveyor system for the 2×100 MW
COAL HANDLING PLANT
The entire
plant at P.T.P.S. is divided into two stations namely station A (Russian Side)
and station B (Indian side) respectively.
Accordingly, there are
2(two) CHP (Coal handling plant) system each one for station A and station B
separately.
(a) CHP for Station
“A” (Russian Side) :-
In CHP system for station A,
there are one wagon tippler two crushers each of capacity 600 T/hr and a net work
of conveyer belts. These equipment are on Russian Design. In this CHP, there in
provision for unloading the coal wagon by wagon tippler. The coal can be fed to
the boiler of unit 1 to 6 directly through coal unloaded from wagons or through
dozing the coal from coal-yard one special provision in this CHP has been mote
to feed the coal to boiler of station “B” also in case of any outage of the CHP
system of station “B” but vice- versa is not provided.
(b) CHP for Station
“B” (Indian Side) :-
There are wide spread belt
conveyor system to feed she red coal bunkers al the various baslens . in CHP
system for station “B” (Indian), there are two wagon tippler, (Qem/s elecon
make, 2nd M/s HEC make for unloading the coal from wagon” A” stacker
and recliner M/s Elecon make has been provided is coal yard to stack and
recliner the coal. One coal crusher house having two coal crusher, capacity 600
T/m each has been provided to crush the the coal. The size al coal from coal
crusher is below 25 m (app) two magnetic separator, one before coal crusher and
other after coal crusher has been provided on conveyor to separate the is on
particles from coal to avoid the damage of equipments.


Tipper No.1 (Station “A)
No.1
No.2
No.1
5
To2B To2A 2 B ……. …..
![]() |
|||
![]() |
|||
|
|
Swing Swing
Feeder
Feeder
W W
W W W
W W W
6ii 6i
5ii 5i 4 3 2 unit no.1
Units constructed in stage 3 extensions.
This plant is being further extended by provision of another wagon tippler and conveyor
system for 2x110 MW units under installation in stage 4 extension.
Coal
received in rail wagon is straight way unloaded on the wagon tripplers and transferred
to raw coal bunkers through a series of conveyor belts. There is also provision
to upload coal on truck hoppers and then to feed by blade feeders as well as by
bulldozing coal to conveyor system in case of non availability of wagon
triplers.
Ash
Disposal Pump House:-
There
are four ash disposal pump in station “A” Russian Side that have been installed
at ash disposal pump house. They are working combined with hydraulic removal of
product of combustion that is slag under boilers and ash under ESP hoppers.
There are crested through three pipe lines of diameter 400 mm. One pipe line is
on working the second one is reserve. They provide to work for four units with
50 MW and two units of 100 MW and with total capacity of 400 MW. In addition,
three flush have been provided for flushing.
Transmission
of Power:-
The
power generated in the station is of 1.5/11 KV and then it is stepped up by
using step-up transformer and fed to the 132/220 KV bus bars. Outgoing 132/220
KV feeders transmit the power to distant places in the state. At the moment
following transmission lines are connected to the 132/220 KV bus bar of the
power station.
(i)
132 KV
feeder to Hatia-I Grid ……………… 2 circuits
(ii)
132 KV
feeders to DVC Patratu (Jindal Previously Basal) transmission line erected but
yet to be commioned on load.
(iii)
132 KV
feeder to DVC Ramgarh –This feeder is utilized for inter connection of DVC grid
with JSEB grid as well as inter trans for of power from JSEB grid to DVC grid
and Vice versa,
(iv)
220 KV
feeder to Hatia-II Grid ……………2 circuits TVNL.
(v)
220 KV
feeders to Tenughat Thermal Power Station) – This line in originally moment for
transmission of 400 KV power but currently it is charged with 220 KV power only.


Comments