Skip to main content

Summer Training Report For Thermal Power Plant- INTRODUCTION

INTRODUCTION

Necessity of the power plant.
                                      “Power to progress”
          Energy provides the power to progress. The natural resources of a country may be large but they can be turned into wealth if they are developed, used and exchanged for the other goods. This cannot be achieved without energy. Availability of sufficient energy and its proper use in any country can results in its people rising from substantial level to the highest standard of living.
          It has been found that countries whose national output is mainly agricultural and whose population lives mostly in rural communities enjoy low per capita growth of energy consumption is dependent is the extent to which industrial activity forms a part of its energy usage undergoes a distinct change. Once energy is made available in excess of domestic needs it has been found that it is not used solely as a consumer good but becomes a factor of production.

Demand of Electricity
         
          A growing proportion of energy is being met all over the world in the form of electricity. This trend will further be stimulated because of increasing availability of clean electricity. This applies especially to development countries because their industrial progress will be based on modern technologies, which generally use electricity intensively.

Establishment of Power Plant:-

          To meet the above mentioned demand of electricity Patratu Thermal Power Station was established (previously Bihar) in Jharkhand. This was authorized in the later part “Heavy Engineering Corporation”, Ranchi, which at that time was one of the biggest production plants in Asia.


P.T.P.S. has four units of 50 MW each capacity and two units of 100 MW capacity each (Russian Side). All the equipment of the power station ordered under the trade agreement with V/0 Machine export USSR. The design of the power station has been prepared by the “Jeploebeiro Production Design Organization of the Thermal Power Station” in the USSR in consultation with “Bihar state Electricity Board”. Initial installation capacity of P.T.P.S. was 400 MW. Latter, to meet the growing power demand of the state the Indian Government installed four units of 110 MW each (normal Indian Site-1). So the total capacity in now 840 MW.

Location and Topography:-

                   Patratu Thermal Power Station is situated near the coal belt of south karakpura in the district of Hazaribagh at the distance of 4 km from Patratu railway Station on Barkakana-Barwadhi railway line. The plant site is 35 km from Ramgarh, 45 km from Ranchi and 87 km from central hazaribagh. The Power plant is connected by railway station, which comes under central eastern railway zone. The road and air from all important cities of the country.

                   The average level of the site above the mean sea level is 372.5 m. the site is on the left bank of Nalkari river which is a tributary of Damodar river. A dam on the upstream site of the nalkari requirement of water. The departments of industry of the Govt. of Bihar have selected a area nearby on the right bank of nalkari river for establishing industries. It is an ideal site for setting up industries.











Climatic condition:-

          The site is situated in the zone of humid climate. Some important meteorological datas are:

          Maximum ambient temperature is 46.30C
          Average annual wet bulb amb. Temp. is 20.20C
          Maximum humidity is 87%
          Average annual rainfall is 50 inches.
          Mostly the wind direction is western & non western.
          General wind velocity at 10m height is 45m/s

Area acquired by P.T.P.S.:-

                   Area of 4155 acres land on the left bank of Nalkari river has been acquired for Power Station, accommodation for staff and other uses. Additional land of 628 acres for ash disposal on the right bank is also in use.

Constructional Details:-

                   The whole plant is mainly divided into five parts: water treatment plant, coal handling unit, steam generator, steam turbine and switch yard, in addition to these cooling towers are also provided. The administrative block is situated just beside the plant.

Plant Details:-

                   Four units of 50 MW(Russian) each having one boiler and two 100 MW (Russian) units each having two boiler run in parallel. There is provision to run 100 MW units at around 50%, capacity with one boiler in service. Also there are four unite of 110 MW (Indian) having one boiler each. The 50 MW unite have single cylinder turbine, 100 MW units have double cylinders but 110 MW units have three cylinders with arrangement for reheating the steam. The turbines and boilers are installed in conventional system i.e. one boiler is connected to its own turbine and there is no provision of another interconnected in boilers and turbines. There is one chimney for exhausting the flue gases for four 50 MW each and one chimney for two 100 MW each (Russian). Another two chimneys for four (110 MW each) Indian boilers (one for two boilers). Thus, there are four chimneys at all having 120m height.

                   Steam is generated at high pressure and temperature in the Boilers, which is utilized to run the turbine at a high speed (3000 rpm). Electric generator is coupled with the turbine and is rotated by the turbine at the same speed, which result in generating power. (as magnetized rotor of generator rotates inside the stator coils.)

                   Power is generated at 10.5 KV which is then stepped up to 132 KV in 50 MW units and 10.5 KV/220 KV in 2 X 100MW units of Russian Plant. Power is generated at 11 KV which is then stepped up to 220 KV. Then these through an autotransformer.




                             FUEL OF POWER STATION

1.                Oil :- It is used during standing period to achieve coal
Combustion temp.
                   Two types of oil are used:-
          (a)     L.D.O. (light diesel oil).
          (b)    F.O. (furnace oil).

Properties of L.D.O.:-
         
          (1)     Flash point                   = 660C
          (2)     C.V.                     = 10,000 Cal/Kg

Properties of F.O:-
         
          (1)     Flash point                   = 1150C
          (2)     C.V.                     = 10,000 Cal/Kg

2.                Coal:-

          Coal is the main fuel used in power house having following proportion:

          (1)     C.V.                               = 3610 to 4300 Cal/Kg, 4700 Cal/Kg
          (2)     Moisture contains 10% to 11%
          (3)     Sulpher                         = 00 to 0.40%
          (4)     Valatyle motter            = 20.5% to 34%
          (5)     fixed carbon                 = 29.6% to 34%
          (6)     size                                = 0 to 10/20 mm
          (7)     Ash deformation temp. = 12000C
          (8)     Ash fusion temp.         = 13500C
                  




SALIENT DATA

RUSSIAN UNITS      (4 X 50 + 2 X 100) MW

(a)                  High pressure steam generator (Boiler)

Supplier                     V/O Machine Export USSR
Type                                     Type T – 155
                                      Radiant Single drum water
                                      Tube pulverized coal fired boiler.
Rated Output                       220 tone/hour
Working pressure               100 atm.
Feed water temp.                 2150C
Superheated steam temp. 5400C

(b)      Steam Turbine                   50MW                          100MW
                   Supplier                        V/O Export,                 V/O Export,
                                                          USSR                            USSR
                   Type                                        K – 50-90                     k – 100-90
                   Casing Cylinder unit   single                            double
                   Rated Speed                 3000 rpm                      3000 rpm
                   Rated Steam pre.          90 atm.                          90 atm.
                   Rated Steam temp.       5350C                            5350C
                   Rated cooling water     270C                              270C

                             Temperature



(c) Turbo Generator: -                 50MW                100MW
          Supplier                                 V/O Export         V/O Export
Type                                       TB-602 T            TB-1002 T’
Casing cylinder unit              single                   double
Rated active power                50 MW                100 MW
Rated generated                     10.5 KV=5%      10.5 KV=5%
Rated power factor                0.8 lagging          0.8 lagging
Speed                                      3000 rpm            3000rpm
Frequency                              50 Hz                   50 Hz

BHEL UNITS             (4x110 MW)
(a)            Boilers:
Manufacturer / Supplier   BHEL Tiruchirapalli, Tamil Nadu,
                                            Radiant, Single drum water tube,
                                            Dry bottom, Pulverized coal fired
                                            Boilers.
Rated output                     380 tones/hour
Working pressure               139 atm
Feed water Temp.               2400C
Superheated steam temp.   5400C=5C

(b)           Steam Turbine :-
Manufacture/Supplier                NHEL, Hyderabad
Type                                            Three casing, condensing steam
                                                     With Reheating.;
Rated Speed                                3000 rpm
Rated steam Temp.                     5350C
Rated cooling water temp.         300C
(c)             Turbo Generator:-
Manufacturer/Supplier              BHEL, Hyderabad
Type                                            IGH-30.2
Rated active power           110 MW
Rated generated Voltage 11 KV ± 5%
Rated Current                             6560 Amp.
Rated Factor                               0.83 lagging
Speed                                          3000 rpm
Frequency                                   50 Hz

COAL HANDLING PLANT

                   There are wide spread belt conveyor system to feed the raw coal bunkers of the various boilers. The entire plant consists of three wagon tippler, two crusher hones and a system of conveyor belts. The plant constructed with extension stage 1 & 2 provided one wagon and a crusher house having two crushers of capacity 600 tones/hour each. The plant has been extended with another wagon tifuly and a crusher house and an additional conveyor system for the 2×100 MW
         
COAL HANDLING PLANT

The entire plant at P.T.P.S. is divided into two stations namely station A (Russian Side) and station B (Indian side) respectively.
Accordingly, there are 2(two) CHP (Coal handling plant) system each one for station A and station B separately.


(a)     CHP for Station “A” (Russian Side) :-
                                      In CHP system for station A, there are one wagon tippler two crushers each of capacity 600 T/hr and a net work of conveyer belts. These equipment are on Russian Design. In this CHP, there in provision for unloading the coal wagon by wagon tippler. The coal can be fed to the boiler of unit 1 to 6 directly through coal unloaded from wagons or through dozing the coal from coal-yard one special provision in this CHP has been mote to feed the coal to boiler of station “B” also in case of any outage of the CHP system of station “B” but vice- versa is not provided.

(b)    CHP for Station “B” (Indian Side) :-
                                      There are wide spread belt conveyor system to feed she red coal bunkers al the various baslens . in CHP system for station “B” (Indian), there are two wagon tippler, (Qem/s elecon make, 2nd M/s HEC make for unloading the coal from wagon” A” stacker and recliner M/s Elecon make has been provided is coal yard to stack and recliner the coal. One coal crusher house having two coal crusher, capacity 600 T/m each has been provided to crush the the coal. The size al coal from coal crusher is below 25 m (app) two magnetic separator, one before coal crusher and other after coal crusher has been provided on conveyor to separate the is on particles from coal to avoid the damage of equipments.


   





  From wagon            from W.T.       Line Diagram of Coal Handling Plant
   Tipper                       No.1              (Station “A)
     No.1
Bunker Line
    No.2                                             6 A
Oval: 2Oval: 1 4             Belt feeder                BF
                 No.2               No.1

    Belt feeder                                                  6 B
 3           No.1                    Plough tipper                            7 B
 




                                   Plough tipper                                             7 A
8
 


                                                                                                 5
 1B      1A                                      2 A
Cool binding
To2B To2A                          2 B                                                         …….    …..
 



Crusher No. 2
 
Crusher No. 2

 
                                                                                                   Swing            Swing
                                                                                                   Feeder           Feeder
                                                                                                   No.2            No.1

                                                                                               3A    to7A   to7A
                                                                                               3B
Tipper 4
3                4B
 


  2                   1          4A
W  W   W   W  W  W  W  W
6ii  6i   5ii   5i   4   3    2   unit no.1
Units constructed in stage 3 extensions. This plant is being further extended by provision of another wagon tippler and conveyor system for 2x110 MW units under installation in stage 4 extension.
                                                
                          Coal received in rail wagon is straight way unloaded on the wagon tripplers and transferred to raw coal bunkers through a series of conveyor belts. There is also provision to upload coal on truck hoppers and then to feed by blade feeders as well as by bulldozing coal to conveyor system in case of non availability of wagon triplers.


Ash Disposal Pump House:-

                             There are four ash disposal pump in station “A” Russian Side that have been installed at ash disposal pump house. They are working combined with hydraulic removal of product of combustion that is slag under boilers and ash under ESP hoppers. There are crested through three pipe lines of diameter 400 mm. One pipe line is on working the second one is reserve. They provide to work for four units with 50 MW and two units of 100 MW and with total capacity of 400 MW. In addition, three flush have been provided for flushing.

Transmission of Power:-

                           The power generated in the station is of 1.5/11 KV and then it is stepped up by using step-up transformer and fed to the 132/220 KV bus bars. Outgoing 132/220 KV feeders transmit the power to distant places in the state. At the moment following transmission lines are connected to the 132/220 KV bus bar of the power station.







(i)                          132 KV feeder to Hatia-I Grid ……………… 2 circuits
(ii)                       132 KV feeders to DVC Patratu (Jindal Previously Basal) transmission line erected but yet to be commioned on load.
(iii)                    132 KV feeder to DVC Ramgarh –This feeder is utilized for inter connection of DVC grid with JSEB grid as well as inter trans for of power from JSEB grid to DVC grid and Vice versa,
(iv)                     220 KV feeder to Hatia-II Grid ……………2 circuits TVNL.

(v)                        220 KV feeders to Tenughat Thermal Power Station) – This line in originally moment for transmission of 400 KV power but currently it is charged with 220 KV power only. 

Comments

Popular posts from this blog

HIGH VOLTAGE TEST TECHNIQUES - Research Paper

Abstract: In this paper we have dealt with the high voltages testing techniques and High voltage measurement techniques.Different techniques like Chubb-Fortescue Method and Peak value measurement are also explained in detail. The method of measurement of voltage with the help of Sphere Gap and Construction of Sphere Gap and its Effects of earthed objects and atmospheric conditions on the accuracy of measurement are explained in details.Other techniques like Principle of measurement of voltage by Electrostatic Voltmeters and its Construction of Electrostatic Voltmetres help in study of High Voltages. Principle of Potential Dividers And types of potential dividers circuit are also covered in this paper. High test voltages generated in laboratories require special techniques for their measurement. Each type of high voltage namely; ac (), dc (=) and impulse () can be suitably measured with more than one different techniques. The choice of the method of measurement in a laboratory is ...