Summer Training Report For Thermal Power Plant- COAL HANDLING PLANT

COAL HANDLING PLANT


          Coal delivery equipment is one of the major components of plant cost.
Coal handling consists of the following steps:-
1.                Coal delivery
2.                Weighing and measuring
3.                Unloading
4.                Preparation
5.                Transfer (Conveyor)
6.                Storage (Yard)
7.                Implant Handling
8.                Crushing and Pulverizing
9.                Feeding the coal into furnace

NOTE:- The coal storage capacity of the plant is 3,00,000 tones and the feeding capacity is 500 tones/hr.
The source of coal is Khalari and Barkakana

QUALITY OF COAL

1.                Grade of Coal: E.F.
2.                Calorific value of coal: 4000 K cal/kg.
3.                Ash content of the coal: 41%=?

EQUPMENTS USED:-

1.                Wagon tippler:- Unloading capacity is 500 tones/hr.
2.                Swing feeder
3.                Traveling Tripler
4.                Reclaim hopper
5.                Vibrator feeder
6.                Magnetic drum
7.                Belt scales
8.                Belt Feeders
9.                Crushers


10.           Bunker hopper
11.           RC Bunker


Power supplied to conveyor                   :        0.4KV/440V
Material Used                                  :        Nylon (6 ply)
Width                                               :        1200mm
Top cover                                        :        3.15mm
Bottom cover                                  :        1.50mm
Grade                                               :        m24
For the generation of steam, we used coal in large amount. It is fossil fuels. Coal is Classified as:-
          *Peat          *Lignite               *Bituminous and
          *Anthracite

          The man features of coal handling are:

1.                Russian 400MW, Indian 440MW
2.                To know the calorific value (required fire as steam used)
3.                To Crush large size Raw coal into small size (25mm)
4.                To remove impurities & provide good flame to boiler.

Main Parts:-

1. Wagon Tippler:-             It is a set of motor, gearbox, railway bogey. It helps in unloading.
2. Bunker Hopper:-             Bunker Hopper, in which there are square holes so that large size coal don’t pass to conveyor.
3. B.F. (Belt Feeder):-         Help to carry this coal.
4. Conveyor:-                       Set of belt of different sizes it is used to carry coal from one place to another .
5. Crusher:-                          To crush or break the coal into 25mm size.




6. RCH (Reclaim hopper) + Swing feeder (SF):- To send coal to yard to swing feeder with the help of Bull Dozer.
Fixed Tippler A&B
Plough Feeder
Blade Feeder (BF)
2. Traveling Tippler:-         For every conveyor two tippler give to bunker coal on both side as requirement.
RC Bunker:-                         Raw Coal bunker.
TST (Telescopic Tube):-    Yard

PROCEDURE:-
1.    Loading coal with the help of cranes in the wagon machine.
2.    By wagon pusher, bring it on the railway track, near the wagon tippler set.
3.    Form Bunker Hopper, coal carried (by filtering of large size coal) with the help of conveyor (belt feeder). It may be underground or aboveground.
4.    Through conveyor at crushers. The crusher the coal into 40mm size.
5.    From crusher. It carries on to ball mill and from ball mill in it goes to pulverize coal bunker inform of
6.    From storing bunker, some big size comes back in ball milling (36 ton steel ball present), through suction vacuum pipe it goes to PC Bunker (Pulverized coal Bunker.)

PROTECTION:-
a)                At the time of bringing in Wagon tippler, few water is mixed/sprayed into coal, so that the dust. May be absorbed.
b)               Do wait till bulb gets OFF, otherwise coal will be remains in boggy.
c)                Grease & oil should be given in bearing properly.





Comments

Popular posts from this blog

HIGH VOLTAGE TEST TECHNIQUES - Research Paper

Abstract: In this paper we have dealt with the high voltages testing techniques and High voltage measurement techniques.Different techniques like Chubb-Fortescue Method and Peak value measurement are also explained in detail. The method of measurement of voltage with the help of Sphere Gap and Construction of Sphere Gap and its Effects of earthed objects and atmospheric conditions on the accuracy of measurement are explained in details.Other techniques like Principle of measurement of voltage by Electrostatic Voltmeters and its Construction of Electrostatic Voltmetres help in study of High Voltages. Principle of Potential Dividers And types of potential dividers circuit are also covered in this paper. High test voltages generated in laboratories require special techniques for their measurement. Each type of high voltage namely; ac (), dc (=) and impulse () can be suitably measured with more than one different techniques. The choice of the method of measurement in a laboratory is ...