COAL
HANDLING PLANT
Coal delivery equipment is one of the
major components of plant cost.
Coal handling
consists of the following steps:-
1.
Coal
delivery
2.
Weighing
and measuring
3.
Unloading
4.
Preparation
5.
Transfer
(Conveyor)
6.
Storage
(Yard)
7.
Implant
Handling
8.
Crushing
and Pulverizing
9.
Feeding
the coal into furnace
NOTE:- The coal storage capacity of the plant is
3,00,000 tones and the feeding capacity is 500 tones/hr.
The source of coal is Khalari and Barkakana
QUALITY OF COAL
1.
Grade
of Coal: E.F.
2.
Calorific
value of coal: 4000 K cal/kg.
3.
Ash
content of the coal: 41%=?
EQUPMENTS USED:-
1.
Wagon
tippler:- Unloading capacity is 500 tones/hr.
2.
Swing
feeder
3.
Traveling
Tripler
4.
Reclaim
hopper
5.
Vibrator
feeder
6.
Magnetic
drum
7.
Belt
scales
8.
Belt
Feeders
9.
Crushers
10.
Bunker
hopper
11.
RC
Bunker
Power supplied to conveyor : 0.4KV/440V
Material Used : Nylon (6 ply)
Width : 1200mm
Top cover : 3.15mm
Bottom cover : 1.50mm
Grade : m24
For the generation of steam, we used coal in large
amount. It is fossil fuels. Coal is Classified as:-
*Peat *Lignite *Bituminous and
*Anthracite
The man features of coal handling are:
1.
Russian
400MW, Indian 440MW
2.
To
know the calorific value (required fire as steam used)
3.
To
Crush large size Raw coal into small size (25mm)
4.
To
remove impurities & provide good flame to boiler.
Main Parts:-
1.
Wagon Tippler:- It is a
set of motor, gearbox, railway bogey. It
helps in unloading.
2.
Bunker Hopper:- Bunker Hopper, in which there are square
holes so that large size coal don’t pass to conveyor.
3.
B.F. (Belt Feeder):- Help to carry this coal.
4. Conveyor:- Set of belt of different sizes it is used
to carry coal from one place to another .
5. Crusher:- To crush or break the coal into 25mm size.
6. RCH (Reclaim hopper) +
Swing feeder (SF):- To
send coal to yard to swing feeder with the help of Bull Dozer.
Fixed Tippler A&B
Plough Feeder
Blade Feeder (BF)
2. Traveling Tippler:- For
every conveyor two tippler give to bunker coal on both side as requirement.
RC Bunker:- Raw
Coal bunker.
TST (Telescopic Tube):- Yard
PROCEDURE:-
1. Loading coal with the help of cranes in the
wagon machine.
2. By wagon pusher, bring it on the railway
track, near the wagon tippler set.
3. Form Bunker Hopper, coal carried (by
filtering of large size coal) with the help of conveyor (belt feeder). It may
be underground or aboveground.
4. Through conveyor at crushers. The crusher
the coal into 40mm size.
5. From crusher. It carries on to ball mill
and from ball mill in it goes to pulverize coal bunker inform of
6. From storing bunker, some big size comes
back in ball milling (36 ton steel ball present), through suction vacuum pipe
it goes to PC Bunker (Pulverized coal Bunker.)
PROTECTION:-
a)
At the
time of bringing in Wagon tippler, few water is mixed/sprayed into coal, so
that the dust. May be absorbed.
b)
Do
wait till bulb gets OFF, otherwise coal will be remains in boggy.
c)
Grease
& oil should be given in bearing properly.