[FREE]Download Full Summer Training Report For Thermal Power Plant-






Content



vIntroduction
v Water Treatment
v Coal Handling
v Steam Boiler
v Steam Turbine
v Generator & Transformer
v Switch Yard
v Fire & Safety



INTRODUCTION

Necessity of the power plant.
                                      “Power to progress”
          Energy provides the power to progress. The natural resources of a country may be large but they can be turned into wealth if they are developed, used and exchanged for the other goods. This cannot be achieved without energy. Availability of sufficient energy and its proper use in any country can results in its people rising from substantial level to the highest standard of living.
          It has been found that countries whose national output is mainly agricultural and whose population lives mostly in rural communities enjoy low per capita growth of energy consumption is dependent is the extent to which industrial activity forms a part of its energy usage undergoes a distinct change. Once energy is made available in excess of domestic needs it has been found that it is not used solely as a consumer good but becomes a factor of production.

Demand of Electricity
         
          A growing proportion of energy is being met all over the world in the form of electricity. This trend will further be stimulated because of increasing availability of clean electricity. This applies especially to development countries because their industrial progress will be based on modern technologies, which generally use electricity intensively.

Establishment of Power Plant:-

          To meet the above mentioned demand of electricity Patratu Thermal Power Station was established (previously Bihar) in Jharkhand. This was authorized in the later part “Heavy Engineering Corporation”, Ranchi, which at that time was one of the biggest production plants in Asia.


P.T.P.S. has four units of 50 MW each capacity and two units of 100 MW capacity each (Russian Side). All the equipment of the power station ordered under the trade agreement with V/0 Machine export USSR. The design of the power station has been prepared by the “Jeploebeiro Production Design Organization of the Thermal Power Station” in the USSR in consultation with “Bihar state Electricity Board”. Initial installation capacity of P.T.P.S. was 400 MW. Latter, to meet the growing power demand of the state the Indian Government installed four units of 110 MW each (normal Indian Site-1). So the total capacity in now 840 MW.

Location and Topography:-

                   Patratu Thermal Power Station is situated near the coal belt of south karakpura in the district of Hazaribagh at the distance of 4 km from Patratu railway Station on Barkakana-Barwadhi railway line. The plant site is 35 km from Ramgarh, 45 km from Ranchi and 87 km from central hazaribagh. The Power plant is connected by railway station, which comes under central eastern railway zone. The road and air from all important cities of the country.

                   The average level of the site above the mean sea level is 372.5 m. the site is on the left bank of Nalkari river which is a tributary of Damodar river. A dam on the upstream site of the nalkari requirement of water. The departments of industry of the Govt. of Bihar have selected a area nearby on the right bank of nalkari river for establishing industries. It is an ideal site for setting up industries.











Climatic condition:-

          The site is situated in the zone of humid climate. Some important meteorological datas are:

          Maximum ambient temperature is 46.30C
          Average annual wet bulb amb. Temp. is 20.20C
          Maximum humidity is 87%
          Average annual rainfall is 50 inches.
          Mostly the wind direction is western & non western.
          General wind velocity at 10m height is 45m/s

Area acquired by P.T.P.S.:-

                   Area of 4155 acres land on the left bank of Nalkari river has been acquired for Power Station, accommodation for staff and other uses. Additional land of 628 acres for ash disposal on the right bank is also in use.

Constructional Details:-

                   The whole plant is mainly divided into five parts: water treatment plant, coal handling unit, steam generator, steam turbine and switch yard, in addition to these cooling towers are also provided. The administrative block is situated just beside the plant.

Plant Details:-

                   Four units of 50 MW(Russian) each having one boiler and two 100 MW (Russian) units each having two boiler run in parallel. There is provision to run 100 MW units at around 50%, capacity with one boiler in service. Also there are four unite of 110 MW (Indian) having one boiler each. The 50 MW unite have single cylinder turbine, 100 MW units have double cylinders but 110 MW units have three cylinders with arrangement for reheating the steam. The turbines and boilers are installed in conventional system i.e. one boiler is connected to its own turbine and there is no provision of another interconnected in boilers and turbines. There is one chimney for exhausting the flue gases for four 50 MW each and one chimney for two 100 MW each (Russian). Another two chimneys for four (110 MW each) Indian boilers (one for two boilers). Thus, there are four chimneys at all having 120m height.

                   Steam is generated at high pressure and temperature in the Boilers, which is utilized to run the turbine at a high speed (3000 rpm). Electric generator is coupled with the turbine and is rotated by the turbine at the same speed, which result in generating power. (as magnetized rotor of generator rotates inside the stator coils.)

                   Power is generated at 10.5 KV which is then stepped up to 132 KV in 50 MW units and 10.5 KV/220 KV in 2 X 100MW units of Russian Plant. Power is generated at 11 KV which is then stepped up to 220 KV. Then these through an autotransformer.






















































                             FUEL OF POWER STATION

1.                Oil :- It is used during standing period to achieve coal
Combustion temp.
                   Two types of oil are used:-
          (a)     L.D.O. (light diesel oil).
          (b)    F.O. (furnace oil).

Properties of L.D.O.:-
         
          (1)     Flash point                   = 660C
          (2)     C.V.                     = 10,000 Cal/Kg

Properties of F.O:-
         
          (1)     Flash point                   = 1150C
          (2)     C.V.                     = 10,000 Cal/Kg

2.                Coal:-

          Coal is the main fuel used in power house having following proportion:

          (1)     C.V.                               = 3610 to 4300 Cal/Kg, 4700 Cal/Kg
          (2)     Moisture contains 10% to 11%
          (3)     Sulpher                         = 00 to 0.40%
          (4)     Valatyle motter            = 20.5% to 34%
          (5)     fixed carbon                 = 29.6% to 34%
          (6)     size                                = 0 to 10/20 mm
          (7)     Ash deformation temp. = 12000C
          (8)     Ash fusion temp.         = 13500C
                  




SALIENT DATA

RUSSIAN UNITS      (4 X 50 + 2 X 100) MW

(a)                  High pressure steam generator (Boiler)

Supplier                     V/O Machine Export USSR
Type                                     Type T – 155
                                      Radiant Single drum water
                                      Tube pulverized coal fired boiler.
Rated Output                       220 tone/hour
Working pressure               100 atm.
Feed water temp.                 2150C
Superheated steam temp. 5400C

(b)      Steam Turbine                   50MW                          100MW
                   Supplier                        V/O Export,                 V/O Export,
                                                          USSR                            USSR
                   Type                                        K – 50-90                     k – 100-90
                    Casing Cylinder unit   single                            double
                   Rated Speed                 3000 rpm                      3000 rpm
                   Rated Steam pre.          90 atm.                          90 atm.
                   Rated Steam temp.       5350C                            5350C
                   Rated cooling water     270C                              270C

                             Temperature



(c) Turbo Generator: -                 50MW                100MW
          Supplier                                 V/O Export         V/O Export
Type                                       TB-602 T            TB-1002 T’
Casing cylinder unit              single                   double
Rated active power                50 MW                100 MW
Rated generated                     10.5 KV=5%      10.5 KV=5%
Rated power factor                0.8 lagging          0.8 lagging
Speed                                      3000 rpm            3000rpm
Frequency                              50 Hz                   50 Hz

BHEL UNITS             (4x110 MW)
(a)            Boilers:
Manufacturer / Supplier   BHEL Tiruchirapalli, Tamil Nadu,
                                            Radiant, Single drum water tube,
                                            Dry bottom, Pulverized coal fired
                                            Boilers.
Rated output                     380 tones/hour
Working pressure               139 atm
Feed water Temp.               2400C
Superheated steam temp.   5400C=5C

(b)           Steam Turbine :-
Manufacture/Supplier                NHEL, Hyderabad
Type                                            Three casing, condensing steam
                                                     With Reheating.;
Rated Speed                                3000 rpm
Rated steam Temp.                     5350C
Rated cooling water temp.         300C
(c)             Turbo Generator:-
Manufacturer/Supplier              BHEL, Hyderabad
Type                                            IGH-30.2
Rated active power           110 MW
Rated generated Voltage 11 KV ± 5%
Rated Current                             6560 Amp.
Rated Factor                               0.83 lagging
Speed                                          3000 rpm
Frequency                                   50 Hz

COAL HANDLING PLANT

                   There are wide spread belt conveyor system to feed the raw coal bunkers of the various boilers. The entire plant consists of three wagon tippler, two crusher hones and a system of conveyor belts. The plant constructed with extension stage 1 & 2 provided one wagon and a crusher house having two crushers of capacity 600 tones/hour each. The plant has been extended with another wagon tifuly and a crusher house and an additional conveyor system for the 2×100 MW
         
COAL HANDLING PLANT

The entire plant at P.T.P.S. is divided into two stations namely station A (Russian Side) and station B (Indian side) respectively.
Accordingly, there are 2(two) CHP (Coal handling plant) system each one for station A and station B separately.


(a)     CHP for Station “A” (Russian Side) :-
                                      In CHP system for station A, there are one wagon tippler two crushers each of capacity 600 T/hr and a net work of conveyer belts. These equipment are on Russian Design. In this CHP, there in provision for unloading the coal wagon by wagon tippler. The coal can be fed to the boiler of unit 1 to 6 directly through coal unloaded from wagons or through dozing the coal from coal-yard one special provision in this CHP has been mote to feed the coal to boiler of station “B” also in case of any outage of the CHP system of station “B” but vice- versa is not provided.

(b)    CHP for Station “B” (Indian Side) :-
                                      There are wide spread belt conveyor system to feed she red coal bunkers al the various baslens . in CHP system for station “B” (Indian), there are two wagon tippler, (Qem/s elecon make, 2nd M/s HEC make for unloading the coal from wagon” A” stacker and recliner M/s Elecon make has been provided is coal yard to stack and recliner the coal. One coal crusher house having two coal crusher, capacity 600 T/m each has been provided to crush the the coal. The size al coal from coal crusher is below 25 m (app) two magnetic separator, one before coal crusher and other after coal crusher has been provided on conveyor to separate the is on particles from coal to avoid the damage of equipments.


   





  From wagon            from W.T.       Line Diagram of Coal Handling Plant
   Tipper                       No.1              (Station “A)
     No.1
Bunker Line
    No.2                                             6 A
Oval: 2Oval: 1 4             Belt feeder                BF
                 No.2               No.1

    Belt feeder                                                  6 B
 3           No.1                    Plough tipper                            7 B
 




                                   Plough tipper                                             7 A
8
 


                                                                                                 5
 1B      1A                                      2 A
Cool binding
To2B To2A                          2 B                                                         …….    …..
 



Crusher No. 2
 
Crusher No. 2

 
                                                                                                   Swing            Swing
                                                                                                   Feeder           Feeder
                                                                                                   No.2            No.1

                                                                                               3A    to7A   to7A
                                                                                               3B
Tipper 4
3                4B
 


  2                   1          4A
W  W   W   W  W  W  W  W
6ii  6i   5ii   5i   4   3    2   unit no.1
Units constructed in stage 3 extensions. This plant is being further extended by provision of another wagon tippler and conveyor system for 2x110 MW units under installation in stage 4 extension.
                                                
                          Coal received in rail wagon is straight way unloaded on the wagon tripplers and transferred to raw coal bunkers through a series of conveyor belts. There is also provision to upload coal on truck hoppers and then to feed by blade feeders as well as by bulldozing coal to conveyor system in case of non availability of wagon triplers.


Ash Disposal Pump House:-

                             There are four ash disposal pump in station “A” Russian Side that have been installed at ash disposal pump house. They are working combined with hydraulic removal of product of combustion that is slag under boilers and ash under ESP hoppers. There are crested through three pipe lines of diameter 400 mm. One pipe line is on working the second one is reserve. They provide to work for four units with 50 MW and two units of 100 MW and with total capacity of 400 MW. In addition, three flush have been provided for flushing.

Transmission of Power:-

                           The power generated in the station is of 1.5/11 KV and then it is stepped up by using step-up transformer and fed to the 132/220 KV bus bars. Outgoing 132/220 KV feeders transmit the power to distant places in the state. At the moment following transmission lines are connected to the 132/220 KV bus bar of the power station.







(i)                          132 KV feeder to Hatia-I Grid ……………… 2 circuits
(ii)                       132 KV feeders to DVC Patratu (Jindal Previously Basal) transmission line erected but yet to be commioned on load.
(iii)                    132 KV feeder to DVC Ramgarh –This feeder is utilized for inter connection of DVC grid with JSEB grid as well as inter trans for of power from JSEB grid to DVC grid and Vice versa,
(iv)                     220 KV feeder to Hatia-II Grid ……………2 circuits TVNL.
(v)                        220 KV feeders to Tenughat Thermal Power Station) – This line in originally moment for transmission of 400 KV power but currently it is charged with 220 KV power only.












                         


WATER TREATMENT PLANT

          Water is an essential part of any power house for electricity generation. In the Thermal Plant, steam is produced by heating of water and steam passed through turbine to move the generator for the production of electricity.

To produce steam, pure water is required. But the water available contains many impurities, which are:-

1.                Un-dissolved and suspended solid materials like mud, sediment, sand, sodium and potassium salts, etc. Sometimes iron, manganese or silica are also present.
2.                Dissolved salts and impurities which include carbonates, bicarbonates, sulphates and chlorides of calcium and magnesium.
3.                Dissolved gases such as carbon dioxide and bicarbonates.
4.                Other materials such as oil, acid, etc.

Therefore presence of the above impurities may damage the boiler and turbine to a great extent. So it is required to check the water and make special treatment before using it in the power plant.

In Patratu Thermal Power Station, water is treated in two stages:-

i)                  At the source (Filtration Plant)
ii)               At the plant.











AT THE SOURCE:- In the filtration plant water is treated in three stages to remove solid particles by mixing alum, chloride and bleaching powder.

1.                USE OF ALUM:- Firstly, water is stored in the water tank. Water contains muddy particles. When the alum is dissolved the muddy particles being heavy settle at the bottom and the fresh water is collected.
2.                BY USE OF BLEACHING POWDER:- After collection of the fresh water, bleaching powder is used for the extraction of bacteria.
3.                BY USE OF CHLORINE:- Water is passed through the chlorine layer which results in removal of oil or acidic particles.

After this, the collected water reaches the “Chemical Water Treatment Plant” (C.W.T.P.). Here, it goes through various processes discussed below:-
1.                Stored in the raw water tank. The starting of CWTP.

2.                Passed through M.G.T. (Multi Grade Filter), by the help of feed pumps. There are 2 feed pumps present at P.T.P.S. one feed pump is working and the other is kept reserve for emergency. In this process sand particles are extracted and the sand free water is collected.

3.                Filtration through A.C.F. (Activated Carbon Filter):- In this process organic carbon is removed.











4.                Filtration by C.E. (Cation Exchanger):-After passing through A.C.F. water is passed through C.E. this process removes all the acidic particles in water.

5.                Use of Degasser:-Here the reaction gases produced after passing through the cation exchanger are releases into the atmosphere.

6.                Filtration by A.E. (Anion Exchanger):- By passing through the anion exchanger, mixed salts which are present in the water are removed. The anion resin used in P.T.P.S. C.W.T.P. is FFI. This is a complex polymer compound which contains free ions.

7.                M.B. (Mixed Bed):- It is also called ion separator. In this, two layers are formed, one of cation and the other of anion. Due to light weight anion is collected at the upper part and the heavy cation ions are collected at the bottom part.

After all these processes, water is collected in the D.M.W.T (De-Mineralized Water Tank).

TEST OF WATER

Before feeding the water in to boiler, the de-mineralized water is tested for satisfaction.

De-mineralized water should have the following specifications:-

Hardness             -        Nil
Silica                             -        Less than 0.02ppm
Conductivity      -        Less than 1 μ/cm.
PH value             -        7



 




COAL HANDLING PLANT


          Coal delivery equipment is one of the major components of plant cost.
Coal handling consists of the following steps:-
1.                Coal delivery
2.                Weighing and measuring
3.                Unloading
4.                Preparation
5.                Transfer (Conveyor)
6.                Storage (Yard)
7.                Implant Handling
8.                Crushing and Pulverizing
9.                Feeding the coal into furnace

NOTE:- The coal storage capacity of the plant is 3,00,000 tones and the feeding capacity is 500 tones/hr.
The source of coal is Khalari and Barkakana

QUALITY OF COAL

1.                Grade of Coal: E.F.
2.                Calorific value of coal: 4000 K cal/kg.
3.                Ash content of the coal: 41%=?

EQUPMENTS USED:-

1.                Wagon tippler:- Unloading capacity is 500 tones/hr.
2.                Swing feeder
3.                Traveling Tripler
4.                Reclaim hopper
5.                Vibrator feeder
6.                Magnetic drum
7.                Belt scales
8.                Belt Feeders
9.                Crushers


10.           Bunker hopper
11.           RC Bunker


Power supplied to conveyor                   :        0.4KV/440V
Material Used                                  :        Nylon (6 ply)
Width                                               :        1200mm
Top cover                                        :        3.15mm
Bottom cover                                  :        1.50mm
Grade                                               :        m24
For the generation of steam, we used coal in large amount. It is fossil fuels. Coal is Classified as:-
          *Peat          *Lignite               *Bituminous and
          *Anthracite

          The man features of coal handling are:

1.                Russian 400MW, Indian 440MW
2.                To know the calorific value (required fire as steam used)
3.                To Crush large size Raw coal into small size (25mm)
4.                To remove impurities & provide good flame to boiler.

Main Parts:-

1. Wagon Tippler:-             It is a set of motor, gearbox, railway bogey. It helps in unloading.
2. Bunker Hopper:-             Bunker Hopper, in which there are square holes so that large size coal don’t pass to conveyor.
3. B.F. (Belt Feeder):-         Help to carry this coal.
4. Conveyor:-                       Set of belt of different sizes it is used to carry coal from one place to another .
5. Crusher:-                          To crush or break the coal into 25mm size.




6. RCH (Reclaim hopper) + Swing feeder (SF):- To send coal to yard to swing feeder with the help of Bull Dozer.
Fixed Tippler A&B
Plough Feeder
Blade Feeder (BF)
2. Traveling Tippler:-         For every conveyor two tippler give to bunker coal on both side as requirement.
RC Bunker:-                         Raw Coal bunker.
TST (Telescopic Tube):-    Yard

PROCEDURE:-
1.    Loading coal with the help of cranes in the wagon machine.
2.    By wagon pusher, bring it on the railway track, near the wagon tippler set.
3.    Form Bunker Hopper, coal carried (by filtering of large size coal) with the help of conveyor (belt feeder). It may be underground or aboveground.
4.    Through conveyor at crushers. The crusher the coal into 40mm size.
5.    From crusher. It carries on to ball mill and from ball mill in it goes to pulverize coal bunker inform of
6.    From storing bunker, some big size comes back in ball milling (36 ton steel ball present), through suction vacuum pipe it goes to PC Bunker (Pulverized coal Bunker.)

PROTECTION:-
a)                At the time of bringing in Wagon tippler, few water is mixed/sprayed into coal, so that the dust. May be absorbed.
b)               Do wait till bulb gets OFF, otherwise coal will be remains in boggy.
c)                Grease & oil should be given in bearing properly.




STEAM BOILER

          IN the Thermal Power Plant steam is the first necessary source to generate the Electricity. Equipment used for the production of steam is boiler. In boiler water is heated up to certain temperature to get steam. Steam thus generated by boiler passes through super heaters, and from there to turbine, it again sent into the boiler in case of re-heater boiler.

                 # BOILER DISTRUBUTION AT P.T.P.S.
PART – I
RUSSIAN UNIT

PHASE – I                                       PHASE – II
For 50 MW units                                      For 100 MW units
Unit number 1 to 4                                   Unit number 5 & 6
4 x 1                                                           2 x 1
4 boilers                                                    2 boilers
One boiler for each                                   there are two boilers for each
50 MW units’                                           100 MW units

Total number of boilers in Russian unit = 08

PART –II
INDIAN UNIT

For 110 MW units
Unit number 7 to 10
4 x 1 = 4 boilers
One boiler for each 110 MW units
Total number of boiler in Indian unit = 4













RANKINE CYCLE GRAPH






















                                                                         












                             DEAETATOR GRAPH
























MAIN PARTS OF BOILER:-

1.      BOILER DRUM: -    It is stock of water which is situated at the top of the furnace. The shape of the boiler is spherical and Dimensions used in P.T.P.S or the boiler drum is spherical and plate of 97mm nominal thickness has an outside diameter, of 1800mm. the drum is of fusion welded design with welded on semispherical dished ends. The drum dished ends are provided with manholes and manhole covers. The long urinal and circumferential welds are properly annealed and X-rayed during manufacture. The drum is provided with stubs for welding, on all connecting tubes such as down comer tubes, return tubes, saturated steam outlet. Tubes feed water inlet tubes etc.
         
Length                           :-       15000 mm
Diameter                       :-       1800 mm
Capacity of drum         :-       70 tones/hr.
Thickness                     :-       97 mm

2.                ROUGH MOUNTINGS:- These consist of access doors into the combustion chamber, regions of super heaters, economizers and air heaters, as well as observation port, explosion doors, dampers in flue gas ducts, etc. the rough mounting are made of cast iron or are of fabricated design depending upon the  location and their purposes.

3.                WATER WALLIS:- Inside the furnace there is a large number of vertical tubes for the production of steam. All the tubes are connected with bottom header by which water flows inside the tube and very nearer to each other when water is heated. Misture of steam and water in produced which goes to boiler drum through up risers steam water is separated.

4.                AIR PREHEATER:- Air pre-heater is a equipment used for heating the passing air before reaching the boiler furnace.
5.                SUPER HEATER:- By the super heater, we get superheated team with very high temperature. Superheaters are placed in the boiler furnace upper parts. 

6.                REHEATERS:- Repeaters are used to increase the temperature of steam.(outlet H.P. cylinder of turbines is boiler for reuse (fed to M.P. cylinder of turbine).


          AUXILARIES:-

1.      P.A FAN (Primary Air Fan) :-  It is used for carrying pulverized coal dust from p.c. system to combustion chamber. Two primary fans are used for each unit at P.T.P.S.

2.                SEPARATOR:- It is used in separate the course particles of coal from vapour/air coal mixture.

3.                CYCLONE:- Function of cyclone in to separate the coal dust and vapour/air. 
          After, combustion coal charged in to ash and slag come in to bottom hopper from there it is removed by slag conveyer in to ash slurry disposal system.

4.      INDUCED DRAUGHT FAN:-  Induced draught fan is used for evacuating flue gases through the chimney.

5.      FORCED DRAUGHT FAN:- Forced draught fan used for given air for combustion to boiler.

6.      CONDENSATE PUMP:- It is used for pumping the condensate  water of hot well in feed water storage track decorator.

7.      BOILER FEED PUMP:- Bolder feed pump is used for water supply into the boiler.
          In the PATRATU THERMAL POWER STATION
          2.  no. of boiler feed pump is used (one is reserved and one is working with one boiler.)

8.      CIRCULATING WATER PUMP:- By the use of circulating water pump, we pass the cold water which is used generator.
(i)      Cooling of steam in condenser coming from final stage of turbine.
(ii)    Cooling the H2 gas in the generator
(iii)   Cooling the bearing of different auxiliaries.

9.      COAL FEEDERS:- For feeding the pulverized coal inside the furnace in control quantity.
10.    MILL PLANT:- It is used for pulvorising coal
          For Stn. A-36MT Ball is used (Stage 1+2)
For Stn. B-52MT Ball is used (Stage 3)
          For Stn. B-Bowl mills are used (Stage 4)
          Size of Ball- Ф 40MM, Ф 50MM, Ф 60MM
          Now day chromium ball are used to increase efficiency of mills.

















SPECIFICATIONS OF BOILER:-

1.             FOR 50 MW UNITS:-

 Rated output               - 220 t/hr.
 Working pressure in boiler drum – 115 atm.
 Working pressure at main valve outlet – 100 atm.
 Feed water temperature – 215oC
 Superheated steam temperature - 540 oC
 Place of boiler – 32 Mtrs.

2.             FOR 110 MW UNITS:-
        Rated output – 375 t/hr.
          Working pressure in boiler drum – 146 Kg/m2.
          Working pressure at main valve outlet – 139 atm.
          Feed water temperature - 240oC (after HPH “1”)
          Superheated steam temperature - 540 oC
          Hight of boiler – 42 Mtrs.
          Feed water temp in After economisor = 318 oC
         

OTHER DIMENSIONS:-

1.         Internal dimension of furnace chamber – 7160 x 9792 mm
2.         Internal diameter of boiler drum– 1600 mm, pitch – 64mm
3.         Diameter of furnace chamber – 8.26 m
Tubes made of steel sheets of 22k grade, 89 mm thickness





TYPES OF SUPERHEATERS USED:-

Station ‘A’                                                       Station ‘B’

1.      Ceiling superheater – I                             Wall Super Heater
2.      Ceiling superheater – II                           Ceiling Super Heater
3.      Platen superheater                                    Low temp super Heater
4.      Convective superheater – I                      Platen Super Heater
5.      Convective superheater – II                    Final Super Heater
                                                                             Convection Super Heater

TUBE LEAKAGE PROBLEMS:- It is the main problem in the boiler arising due to the following factors:-

1.      High temperature inside the furnace.
2.      Chocking due to salt accumulation.
3.      High slaging factor.
4.      Furnace explosion.
5.      Furnace draft high/low.
6.      Lower Quality of steam flow Extension-III

Station ‘B’:-

There are 16 nos. of P.C burners and 12 nos. of Vapour burners (Tangentially fired).
There are 4 nos. of oil burners (side fired)

Nos. of Equipments in each boilers:-
1. ID Fans                     2 Nos.
2. FD Fans                    2 Nos.
3. P.A Fans                   2 Nos.
4. Ball Mills                 3 Nos.
5. Vapour Fans            3 Nos.
6. P.C Feeders              16 Nos.
7. R. C Feeders             3 Nos.
8. Slag Crushers 4 Nos.
INTERLOCK AND PROTECTION OF BOILER

Boiler will trip if

1.                Both F.D. Fans. Trip
2.                Furnace draft reaches + 40 mm wc
3.                Boiler drum level high (+ 200 mm)
4.                Boiler drum level low (- 200 mm)
5.                Both ID Fans trip.
6.                If Turbine trips
7.                If Generator trips

Boiler should be tripped if

1.                If all P.C. Feeders trip.
2.                If both P.A. Fans trip.
3.                If there is no fire in furnace 




STEAM TURBINE

(RUSSAINUNIT & INDIAN UNIT)

          The 110 MW condensing steam turbine is designed   directly coupling with Hydrogen cooled generator. The steam turbine is designated for operation with live steam ate 146ata pressure and 535-5400C temperature as measured before the entry into the turbine emergency stop valve. The steam turbine has three cylinder mixed blades with a wheel Curtis at the governing stage and 8 pressure stages is H.P. cylinder. The turbine is divided into three parts:-

1.                H.P.-High Pressure
2.                M.P.- Medium Pressure
3.                L.P.- Low pressure

After each pressure section in the steam turbine, bearings are connected. Due to this, movement of the rotor of turbine is easy.

PRINIPLE:- There are two parts of a turbine:-p

1.                Stator Part
2.                Rotor Part

The blades of the turbine make some angle with the shaft. Due to injection of steam, rotor is rotating and a generator is directly coupled with the steam turbine shaft. Rotational energy of the turbine shaft is directly transferred to the rotor of generator and after rotation, electricity is produced in P.T.P.S.

WORKING:-
          At the starting position, steam is firstly injected in the medium pressure cylinder of the turbine. Before this operation, by the bearing gear, we give some rotation (approx. 63rpm),


This is operated electrically. Due to injection we at steam in M.P. turbine, raise the speed of turbine rotor up to 500rpm. After this operation, main steam line stop valve is opened which is operated at the H.P. Cylinder side. After rotation, the steam pressure is constant but temperature decreases. So again the extracted is sent to boiler for reheating steam and is in to M.P. Cylinder. Before again injecting after this operation, steam is injected to the L.P. Cylinder section.

Turbine rotor is flexible one with having following critical speed. H.P. Turbine- 2355rpm M.P. & L.P. turbine-1900-2200rpm.

STEAM EXTRACTION:-

          The steam turbine has five outlet steam extraction pipe for the extraction of steam. Pipes are insulated with thermosetting materials.  
For feed water heating upto 2180C before going to economizer coal in the boiler. In this process consumption of ste am is approx  25T/hr. Besides, steam upto 7 T/hr. is used for heating up deareator from 2nd or 3rd extraction line steam.

DIFFERENTIAL EXPANSION:-

          H.P.-(-)      1.5mm to 3.5mm
          M.P.-(-)     1.5mm to 3.5m
          L.P.-(-)       2.0mm TO 4.0mm

AXIAL SHIFT DISPLACEMENT: +/- 0.62mm
          H.P. total Expansion- 25mm








DIFFERENTIAL TEMPERATURE:-

          H.P. Top/Bottom
          H.P. Top/Flange                              -100Cto 500C in normal running
                                                                             Condition.
          M.P. Top/Bottom                  Maximum during rolling: - 700C
          M.P. Top/Flange

GOVERNING PARAMENTERS:-

1.      Opening of Interceptor valve                  -        0.8kg/cm2 of sec.
                                                                             Oil Pressure.
2.      Opening of Gov. Valve 1&2                   -        1.05kg/cm2 of sec.
                                                                             Oil Pressure.
3.      Opening of Gov. Valve 3               -        1.78kg/cm2 of sec.
                                                                             Oil Pressure.
4.      Opening of Gov. Valve 4               -        2.8kg/cm2 of sec.
                                                                             Oil Pressure.
5.      Full opening of I.V. (L&R)            -        2.8kg/cm2 of sec.
                                                                             Oil Pressure.
6.      Full opening of Gov. (1&2)          -        2.9kg/cm2 of sec.
                                                                             Oil Pressure.
7.      Full opening of Gov. (3)                -        2.3kg/cm2 of sec.
                                                                             Oil Pressure.












 






































110MW BHEL UNITS

Main Technical Data for Two Turbo sets of 110MW

BSIC PARAMETERS:-

1.                Rated output measured at the terminals for the generator 110MW.
2.                Economical output=95MW.
3.                Rated speed= 3000 rpm
4.                Rated pressure of steam just before stop valve=130 atm.
5.                Rated temperature of steam just before stop valve= 5350C.
6.                Max. Pressure of steam just before the stop valve= 146atm.
7.                Max. Temp. of steam just before the stop valve= 5450C
8.                Rate pressure before medium pressure casing= 3163 ata.
9.                Rated Temp. before medium pressure casing = 5350C
10.           Max. Pressure before M.P. casing = 35 atm.
11.           Max temp. before M.P. casing= 5450C

SYSTEM OF THE TURBINE (110 MW)

1.                4 control valve+2 interceptor valves
H.P. cylinder:- 2 rows of curtis wheel+8 action wheel
2.                Medium pressure cylinder:- 12 action wheels.
Weight of M.P. cylinder;- 11000kg. (approx)
3.                Low pressure cylinder:
-4 action wheel of double flow
Weight of low pressure rotor (approx):- 4000kgs.
Direction of the turbine rotation
looking from the front bearing pedestal:- Clock wise
Rotors rotate at 62rpm on bearing gears.
Number of non-regulated extractions=8




GOVERNMING

REGULATING AND SAFETY EQUIPMENT OF THE TURBINE

          The quantity of steam entering the turbine is regulated by means of four governing valves (GV) on the inlet to the H.P. part and by two interceptor valves (IV) on the M.P. part. The amount of opening at any instant of these valves is given by the pressure of secondary oil, which is indirectly dependent on the primary oil pressure and directly dependent upon the spring force in the transformer. The pressure of the primary oil is directly dependent upon the speed of the set through the speed-sensing element. The tension of the spring in the transformer can be varied by the speed changer and by that it is possible to vary the speed before synchronizing and to vary the load after synchronizing the alternator with the grid.



          The non-uniformity of the regulation can be changed continuously in the range of 3 to 5.5% by the means of non-uniformly changer (NUC) and by that the proportion of change of output of the set can be influenced with respect to the other machines connected to the common gird when there is a change on loading on grid.










SOME DESIGNED PARAMETERS

1.    Main Steam:-

Pressure- 130kg/cm2
Temp-     5350C+50C
Flow-      365T/hr

2.    Cold reheat steam:

Pressure- 35kg/cm2
Temp-     3690C
Flow-      360T/hr

3.    Hot regeat steam:

Pressure- 33kg/cm2
Temp-     5400C+50C
Flow-      313T/hr

Numbers of equipments in:

1. Boiler feed pump                             2 Nos.
2. Condensate pump                            3 Nos.
3. Circulation water pump                  3 Nos.
4. Starting oil pump                            2 Nos.
5. A. C Emergency oil pump              1 No
6. D. C Emergency oil pump              1 Nos.
7. L. P Heaters                                      5 Nos.
8. H.P Heaters                                      2 Nos.






INTERLOCK AND PROTECTION OF TURBINE

Turbine will trip automatically if:-

1.    Condenser vacuum drops to ( - ) 0.5 Kg/cm2
2.    Control oil pressure drops to 7.0 Kg/cm2
3.    Lub. Oil pressure drops to .08 Kg/cm2 
4.    Axial shift becomes + .065mm.
5.    Primary oil pressure become .05 Kg/cm2
6.    If boiler trips.  
7.    If generator trips.

Turbine should be tripped if:-
a.     There is increase of high vibration or some metallic sound.
b.    Sudden entering of water in turbine resulting cooling os some turbine parts.
c.     Return bearing oil temperature reaches 700 C.
d.    Temperature of bearing Babbitt metal reaches, 850 C.
e.     If all condensate pumps trip.
f.      If all C. W. Pumps trip.
g.     The Temperature of main steam/hot re- heat steam inc/dec max/min value.



GENERATOR

INTRODUCTION:-

          Alternators (A.C. generator) are also known as synchronous generator. Its main function is to convert mechanical power from a prime mover to electric power at a specific voltage and frequency.
Large generators are used to generate bulk power at thermal, hydroelectric and nuclear power stations.
3-phase synchronize generators are used in3-phase generation, transmission & distribution.

A)   STATOR:-
Stationary part, comes the armature winding in which voltage is generated i.e. output is taken from stator.
YOKE (frame): Cast iron for small machine and welded steel for large machine.
CORE: Assembled with high grade silicon content steel lamination to reduce iron losses.
STATOR WINDING: A 3-phase winding puts in the slot in stat connection.

B)   ROTOR:-
*Salient pole rotor                          *cylindrical rotor

Rotor is a rotating part, which produces the main field flux in which supply is given through d.c. generator calledencitor. in PTPS cylindrical rotor is used.
1.                Slots are at regular intervals & parallel to the shaft on which d.c. field winding occurs.
2.                Rotor is smoother machine, makes less winding losses & the operation is less noisy (due to uniform air gap).
3.                Cylinder rotor is two or four pole type alternator, which provides greater mechanical strength & permits more accurate balancing.
4.                It is driven by steam or gas turbine i.e. turbo generator or turbo.


D.C. EXCITER:-

          Excitation means production of flux by passing current in the field winding (rotor) from d.c. generator. As a rotor has no more residual magnetism, so first of all to make it electromagnetic i.e. dc is supplied to the rotor through brushes and slip ring.

PRINCIPLE-VOLTAGE GENERATION:-

          A prime mover (machine) supplies the mechanical energy input to the alternator i.e. steam cuts turbine or gas turbine. Actually, armature conductor on the stator, the field flux of the rotor & voltage is generated.

AVR (Automatic Voltage Regulator)
·        It controls the system voltage with alternator.
·       If any fault in the system to increase the excitation for maximum synchronizing.
·       Automatic Voltage regulation at the time of sudder cha of load/loss of load on the system.

Scheme Diagram:-

                             AVR                    Automatic voltage regulator
 



                             Exciter                 DC Generator
 



                             FB                        Field Breaker
 



                             SB                        Slip ring Brushes
 


          Field winding of Rotor                  Alternator

F) SYNCHRONISM CASE:-

1.                Frequency- supply frequency & grid frequency should be matched.
2.                Voltage- Generated voltage & System voltage should be matched.
3.                Phase sequence- Matching phase sequence (i.e. positive phase sequence) it should be at 60deg. either lagging or leading.
G) PROTECTION (ELECTRICAL):-
    I.        Negative phase sequence relay
    II.       Phase to phase fault.
III.             Phase to earth.
IV.            A) Over fluxing b) over current and c) over load d) over balanced load.
V.                Loss of excitation (Current power)
VI.            Anti-motoring (Failure of Prime Mover).
MOTORING
1.                Prime Mover
2.                    AVR
3.                    Generator

INDUCTION MOTOR:-
a)                Prime Mover (Turbine)- Fails  (trip)
b)                    Excitation- Zero (field breaker trips)
c)                     Generator Breaker- ON
Then the generator will act as Induction Motor. In case as motoring.

SUNCRONOUS MOTOR:-
a)      Prime Mover (Turbine) -      fails (trips)
b)      Excitation- Zero (field breaker trips)
c)      Generator Breaker- ON
Then the generator will act as Induction Motor. In case as motoring.



TRANSFORMER

          Transformer is a static device, which transfers electric power from one circuit to another circuit at const. Power, and frequency. These are two types of transformer

1.                Step up transformer:- Low voltage to High voltage.
2.                Step down Transformer:- High Voltage to low voltage.

There are mainly two parts of transformer:-
1.                External Parts.
2.                Internal Parts.

OBSERVATION:-

TRANSFORMER
 



a) Parts    b) Interconnection   c) Damage    d) Protection   e) Application
 




                                                                             Internal                External
1)   Internal Parts:-          a) Coil (Winding)
b) Core (Silicon Steel Sheet)
c) Oil (Mineral oil/Porcelain oil)
a) Coil:- In the power transformer there are two types of winding (wire).
I)       Round winding:- For small Transformer
II)     Flatted winding:- (Copper) for large transformer.
          In the winding there are two types of connection:
·       Star Connection Secondary side
·       Delta Connection Primary side




``

In actual, winding are:-

Single winding- Auto transformer
Double winding- Double magnetic Circuit
Three winding- Three phase transformer

b)      Core- It is made of silicon steel sheet laminated with insulation (mica, porcelain oil etc.)
c)      Oil- In the transformer mineral oil is filled in the oil tank. Its main function
          # cooling of winding Due to movement of oil
          # Insulating.

2)   External Parts:-
a)                Oil tank (trans. Body)
b)               Conservator
c)                Radiator (Oil pump fan)
d)               Breather (Lungs)
e)                Explosion vent or PRV (Pressure release valve)
f)                 Tap changer
g)                Bushing (LV,HV,MV)
h)               Buchoize Relay
i)                  Thermo signaliser
j)                  CT & PT
k)               Aux. Transformer
l)                  Earthling Bus bar












                       
I)                 Oil tanker:- Body of the transformer (Ferro Magnetic material) in which mineral oil is filled up.

II)             Conservator:- Conservator is a cylindrical hollow tank & it is connected with transformer body.
It acts on oil reservoir to maintain the level of oil in the transformer. When it is on “Load” and on “No load” in either care.

III)         Radiator:- Radiator is used for natural cooling of oil. For cooling of Radiator internal fan and oil pump is used oil pump circulates the oil & distributed in diff. section of radiator to keep coal.

IV)         Breather:-  It is connected to conservator. Its main function is to remove moisture in air ingress through pump. Oil layer goes up & down during this incident making a chance of introduction moisture air in oil, which is harmful to insulator & transformer oil (Acidic). It contains silica gel.

V)             Explosion vent (Whistle)- It is connected over the transformer, it forms high gas. If I gets no way to exit, it will come out with explosion i.e. to gets blast and break the Bakelite foil, it has diaphragm made up of bakelite foil or aluminum foil.
Nowadays instead of explosion vent, PRV (Pressure release valve) is used i.e. to release gas as pressure increases
VI)         Tap Changer:-  Tap changer is connected to secondary winding transformer. It contains no. of contact points (winding) of different voltage and operated manually.
In the PTPS nine, five, seventeen steps tap changer are used to maintain the voltage level of transformer tap changer may work in different modes i.e. on load, off load & Auto load. 
VII)     Bushing:- Bushing is a type of insulator situated at the top of transformer body. Its main function is to introduce flux or electrical connection from power transformer to switch yard.

VIII) Bucholze Relay:- It is a gas detector relay used to protect transformer from minor fault and heavy fault. Any types of fault or short circuited or sudden damage in insulator, oil of the tanks gets over heated and gases formed It is connected.
It is used for larm. The up & Down in oil level disturbs the equilibrium of the gas flouts no mercury will come in first contact and a signal arrived in the control room either an alarm or a glowing bulb.
Further it large volume of gas generated again equilibrium will disturb and mercury comes in second contact i.e. closed and transformer will trip.

IX)         Thermo Signalizer:- It is used for measuring temperature. It contains
* Stem- Methyl chloride gas is filled.
* Capillary tube:- It is covered by PVC. In capillary tube methyl. Chloride gas is also filled it is made up of copper. It has combination of four small size bulbs. Its n needle pointers, when tempt will increase contact their no signalizer make contact at 650C and tripped the transformer.
* In the upper piping of the transformer. The ups and down in the oil level due to formation of gas. Disturbs the mercury equilibrium in the relay and the 1st enunciation (alarm)    comes.

X)             CT and PT:- Both are instruments. CT is used to measure current at rated voltage. It is used in switched yard. For one phase one CT is used. It is also used as protective device.
#PT is used to measure voltage at rated current. It is used in plant near the connection and generator and bus bar i.e. situated at bus bat.

XI)         Auxiliary Transformer:- Two aux. transformer of rating (7.5MVA) are connected to provide power supply in unit.






XII)     Earth (Grounding):- Tow purpose of earth
a)                To earth, any electrical leakage goes to ground (Zero potential) otherwise current will conduct in all body of transformer and a chance shock.
b)               Helps in phase test.

XIII) Bus bar:- It is solid materials made of copper. It is aluminum size 10mm (large for HV). It helps in connecting switches and other equipment of power transmission.
#Main bus bar measuring instrument, relay etc. associated with it
# Transfer bus (aux. bus) used for connecting feeder or equipment (Selector or transfer switch)
b)      Interconnection:- Star connection (Secondary Side)
                                                Delta Connection (Primary Side)
c)                Damage:-
1)   Due to movement in oil it will be heated and damage the insulating material.
2)   Up & Down in oil level in the conservator, a moisture air is introduced and makes oil acidic.
d)               Protection:-
1)      Winding should be insulated.
2)      Cooling of winding is necessary.
3)      Output should be taken with the help of Bushing.
4)      Earth is necessary otherwise shocked.
5)      Fan & oil pump is used to keep cool radiator.
6)      Foil in diaphragm is of bakelite (Should be blasted).

e)                Applications:-
d)               Use in communication and electronic system (Transformer will amplifier)
e)                Generator transformer used in plant.
f)                 Distribution transformer used for industrial used.
g)                To match source and load for maximum power transfer.




1.      Generator transformer           11T
                   Capacity                       60MVA
                   Voltage ratio                10.5/33/132KV
          Auxiliary transformer           21T
Capacity                       7.5MVA
                   Voltage ratio                10.5/6.6KV
          Unit transformer                             41T
                   Capacity                       320KVA
                   Voltage ratio                 6.6/0.4KV

2.      Generator transformer           12T
                   Capacity                       60MVA
                   Voltage ratio                10.5/33/132KV
          Auxiliary transformer           22T
Capacity                       7.5MVA
                   Voltage ratio                10.5/6.6KV
          Unit transformer                             42T
                   Capacity                       320KVA
                   Voltage ratio                6.6/0.4KV

3.      Generator transformer           13T
                   Capacity                       60MVA
                   Voltage ratio                10.5/33/132KV
          Auxiliary transformer           23T
Capacity                       7.5MVA
                   Voltage ratio                10.5/6.6KV
          Unit transformer                             43T
                   Capacity                       320KVA
                   Voltage ratio                6.6/0.4KV









4.      Generator transformer           14T
                   Capacity                       60MVA
                   Voltage ratio                10.5/33/132KV
          Auxiliary transformer           24T
Capacity                       7.5MVA
                   Voltage ratio                10.5/6.6KV
          Unit transformer                             44T
                   Capacity                       320KVA
                   Voltage ratio                6.6/0.4KV

5.      Generator transformer           15T
                   Capacity                       125MVA
                   Voltage ratio                10.5/33/220KV
          Auxiliary transformer           25T, 26T
Capacity                       7.5MVA
                   Voltage ratio                10.5/6.6KV
          Unit transformer                             45T, 46T
                   Capacity                       320KVA
                   Voltage ratio                6.6/0.4KV

6.      Generator transformer           16T
                   Capacity                       125MVA
                   Voltage ratio                10.5/33/220KV
          Auxiliary transformer           27T, 28T
Capacity                       7.5MVA
                   Voltage ratio                10.5/6.6KV
          Unit transformer                             47T, 48T
                   Capacity                       320KVA
                   Voltage ratio                6.6/0.4KV












SWITCH-YARD

The main function of Switch-yard is:-
          ¯ It makes available the generated power at plant to the people.
          ¯ Power generated transmitted via Switch-Yard
          ¯ To protect the plant due to sudden damage happening
Outside the plant.
               Switch – yard scheme (in PTPS)
               1 to 10 Units                                        PTPS  132KV   Hatia- I
                 1 to 4-50 MW                                            ………   Hatia –II

Russian
               5 to 6-100 MW                                    PTPS  220KV  Hatai –I
               7 to 10-110 MW- Indian(BHEL)                ………   Chandil
          PTPS (Outgoing feeders)
          1.      a)      132KV                          Ramgarh (D.V.C.)        5C
                   b)      132KV                          BASL (Jindal)              6C
          2.      a)      132KV                          Hatai-I grid                   8C    
                   b)      132KV                          Hatia-I grid                   9C
                                                                   (Line Hatia-I)
          3.      a)      220KV                          Hatia-I grid                   1b
                                                                   (Line Hatia-I)
                   b)      220KV                          Hatia-I grid                   2b
          4.                400KV/220KV            TTPS (TVNL)         P.T.P.S.

                  In the PTPS switch yard the main equipment in installed are as.

                      LA                       Lightening Arrester
                      CT                       Current transformer
                      PT                        Potential transformer




                      Autotransformer
                      Insulator
                      Bus
                      Bushing
                      Wave trap
                  
1)      Lightening Arrester (LA):-
                   As overload voltage is enclosed transmission line due to lightening, so the main function of LA is to divert the incoming high voltage for round i.e. earthed this HV, the HV is due to lashing thundering sky.

2)      CT:-
                   It is a protective device, which measures the current at
rated voltage.
®    It has one turn of primary winding i.e. the conductor of the ckt. It self formed the primary of the CT.
®    Rating of Ct is very small i.e. 15VA and more exists to 30 VA. The heavy current is used to be measured without breaking the current ckt. With the help of CT.
Few data of CT used at PTPS:-

Turn Ratio                             1200/1 A
                             Frequency                    50Hz.
                             Voltage                         240KV
                             Capacity                       26.4KVA

3)      PT (Potential Transformer):-
It is also a protective device used to measure the voltage.
          Used for voltages above 380V.
          It has more turns is primary and less turns in secondary so
that potential is reduced to measure the voltage by using low
capacity voltmeter.

Each phase of the system has different PT
One such data of PT at P.T.P.S. :-
          Rated Burden               400/600 Va
          Voltage Ratio               220KV/110V (measurement)

4)               Auto Transformer:-

(i)                          There are two auto transformer used in switch yard (Auto T1, Auto T2)
(ii)                       Main function it primary side generation is low and demand on secondary is high. Then autotransformer will maintain is from other side generation with no loss of power and vice- versa.
Rating – 150MVA, 120MW
5)         Circuit Breaker:- There are four types of CB in Patratu  Thermal Power Station:          
              I)       OCB (Oil Circuit Breaker)
              II)     VCB (Vacuum circuit Breaker)
III)          ABCD (Air Blast Ckt. Breaker)
IV)          SF6 (Sulpher haxa Fluoride gas ckt. Breaker)
CB is a Protective device acts as a switch
but the main difference between breaker and switch, switch having no any protection i.e. manually On/Off, but in case of CB it has a protection device like Relay.

     FUCTIONS:- 
    
¯     To make & break the normal operating current.
¯     To open & close on load.

     Principal:- It has two coils namely closing coal and tripping
          coal and spring charging mechanism which may either be
          charged by motor (spring charging motor) or manually by
          manual operating handle.
                            
                                      By charging closing coil (Electrical Supply
           in given to coil), the breaker may be mode “ON” by
          Local/remote switch similarly by emerging tripping coil
          (Electric supply given to coil) we may make the breaker
          “OFF” by local/remote switch or the breaker may trip on
          Protection such as earth fault/ over current in the transmission line by it self.
                   ¯ Current coil made up of copper.
                   ¯ SF6-SF gas is used to burn off the spark.
                   ¯ ABCD _ Air used to burn off arc extinguisher.
                   ¯ OBC – Oil used to burn off the sparking, takes place
                                      due to heating oil.

     6)        Isolator:-
                  
                   ¯ It is a disconnection switch and to be operated on
                   load not (When circuit breaker is in closed position)
                   ¯ It is necessary to facilitate mainul work on
                   transmission line & circuit breaker.

     7)        Bus:-
                  
                   ª BUS is a system, witch helps in is transmission of voltage as per availability and requirement.
                   « At PATRATU THERMAL POWER STATION in 33KV switchyard – two Buses are used to charge the station transformer and also used to supply the power to the Patratu Thermal Power Station
                   ¬ In 132 KV switchyard three buses is used for same purpose.

     8)        Bushing:-
                  
­  It is a type of insulator and design above 2000amp.
­  Through it terminal should be taken out for transmission i.e. protect to shock.
    
9)          Wave Trap:-
              ¬ wave trap is an equipment installed in Switch yard for telecommunication on line.
              ¬ It has a coupling capacitor i.e. trap the communication among P.T.P.S. grid and substation connected to it.



FIRE & SAFETY


          Sources of Fire
The main source of fire in any industry are electricity, smoking, friction, over heating material, hot surfaces, burner flame ignition cutting ad welding, mechanical spark, static spark and other sources asa exposure, the extent to which the industrial fire is caused by this sources which has been shown as under:
                                      Electricity                              32%
                                      Smoking                                 09%
                                      Friction                                  10%
                                      Hot surfaces                           15%
                                      Burner Flame                         06%
                                      Spontaneous Ignition           05%
                                      Cutting and welding             09%
                                      Mechanical Spark                 02%
                                      Static Spark                           02%
                                      Others                                     10%
                                      Total                                       100%


Cause of Fire
1.                Cutting &  welding
2.                Heat/ over heat
3.                Elec. Arc/Spark, Elec. Short circuit
4.                Metal Spark
5.                Loco Spark
6.                Mechanical Fault
7.                Spontaneous Combustion
8.                Static Electricity
9.                Improper Quenching
10.           Friction
11.           Open Flame
12.           Not Known
13.           Miscellaneous and others

Important fire haards in thermal power station

1.                Boiler
a)    Accumulation  of coal dust
b)   Air pre hearts
c)    Fuel oil
d)   Rejected coal from coal mills


2.                Turbine
a)    Oil leakages from bearings
b)   Oil leakages from Sealings
c)    Oil leakages from Governing system
d)   Oil leakages from jacking system Etc.

3.                Generator
a)    Leakage of
b)   Exciter sliperings


4.                Oil Facility
a)    Fuel oil in tanks
b)   Oil splashes mear oil transfer pump & motors
c)    Oil splashes in tunnels


5.                Coal handling plant
a)    Spontaneous fire in coal heaps
b)   Coal dust
c)    Conveyor belts
d)   Mobable equipments


6.                Hydrogen plant
a)    Electric Equipments


7.                Switch yard
a)    Transformers
b)   Breakers
c)    CT/PT

8.                Transformers/Breakers/Cables
a)    Generator transformers
b)   Unit aux transformers
c)    Switch gear rooms
d)   Cable galleries





















FIRE PROTECTION
To reduce to loss of fire is FIRE PROTECTION.
Fire Protection is a planned approach to the provision of adequate structural safe guard against the possibility of fire speard and the availability of fixed and portable appliances which will readily available in emergency.
The protection is done by various type of system.

FIRE PROTECTION SYSTEM:-
System which are used to reduce the loss of fire is
FIRE PROTECTION system.
There are two types of Fire Protection System
1.    Active System.
2.    Passive System.


ACTIVE FIRE PROTECTION SYSTEM
As their name indicte that the systems which are operated automatically in case of fire ate Active Fire Protection system
1.    Sprinkler System
2.    Mulsifyre System
3.    CO2 injection System




4.    Smoke Detection System clubbed with total flooding system of any extinguishing agent.
5.    Automatic Modulars.
6.    fire resisting Coating for H.T. Cables.

PASSIVE FIRE PROTECTION SYSTEM
The systems which are operated manually in case of fire to reduce fire loss are PASSIVE FIRE PROTECTION SYSTEM.
1.    Smoke Detection System.
2.    Heat Detectors.
3.    Booster Pump System.
4.    Landing Valves.
5.    Hydrant System.
6.    Dry Riser System.
7.    Foam Pourers.
8.    Hydrant Ring main
9.    Deluge System.
10.     First Aid Fire Fighting Equipment.
11.     Static Tank Water Spray System.




Comments

Popular posts from this blog

HIGH VOLTAGE TEST TECHNIQUES - Research Paper

Abstract: In this paper we have dealt with the high voltages testing techniques and High voltage measurement techniques.Different techniques like Chubb-Fortescue Method and Peak value measurement are also explained in detail. The method of measurement of voltage with the help of Sphere Gap and Construction of Sphere Gap and its Effects of earthed objects and atmospheric conditions on the accuracy of measurement are explained in details.Other techniques like Principle of measurement of voltage by Electrostatic Voltmeters and its Construction of Electrostatic Voltmetres help in study of High Voltages. Principle of Potential Dividers And types of potential dividers circuit are also covered in this paper. High test voltages generated in laboratories require special techniques for their measurement. Each type of high voltage namely; ac (), dc (=) and impulse () can be suitably measured with more than one different techniques. The choice of the method of measurement in a laboratory is ...