INTRODUCTION
Necessity of the power plant.
“Power
to progress”
Energy
provides the power to progress. The natural resources of a country may be large
but they can be turned into wealth if they are developed, used and exchanged
for the other goods. This cannot be achieved without energy. Availability of
sufficient energy and its proper use in any country can results in its people
rising from substantial level to the highest standard of living.
It has
been found that countries whose national output is mainly agricultural and
whose population lives mostly in rural communities enjoy low per capita growth
of energy consumption is dependent is the extent to which industrial activity
forms a part of its energy usage undergoes a distinct change. Once energy is
made available in excess of domestic needs it has been found that it is not
used solely as a consumer good but becomes a factor of production.
Demand of Electricity
A
growing proportion of energy is being met all over the world in the form of
electricity. This trend will further be stimulated because of increasing
availability of clean electricity. This applies especially to development
countries because their industrial progress will be based on modern
technologies, which generally use electricity intensively.
Establishment of Power
Plant:-
To meet
the above mentioned demand of electricity Patratu
Thermal Power Station was established (previously Bihar )
in Jharkhand. This was authorized in the later part “Heavy Engineering
Corporation”, Ranchi , which at that time was
one of the biggest production plants in Asia .
P.T.P.S. has four units of 50 MW each capacity and
two units of 100 MW capacity each (Russian Side). All the equipment of the
power station ordered under the trade agreement with V/0 Machine export USSR . The design of the power station has
been prepared by the “Jeploebeiro
Production Design Organization of the Thermal Power Station” in the USSR in consultation with “Bihar
state Electricity Board”. Initial installation capacity of P.T.P.S. was 400 MW.
Latter, to meet the growing power demand of the state the Indian Government
installed four units of 110 MW each (normal Indian Site-1). So the total
capacity in now 840 MW.
Location and Topography:-
Patratu
Thermal Power Station is situated near the coal belt of south karakpura in the
district of Hazaribagh at the distance of 4 km from Patratu railway Station on
Barkakana-Barwadhi railway line. The plant site is 35 km from Ramgarh, 45 km
from Ranchi and
87 km from central hazaribagh. The Power plant is connected by railway station,
which comes under central eastern railway zone. The road and air from all
important cities of the country.
The
average level of the site above the mean sea level is 372.5 m. the site is on
the left bank of Nalkari river which is a tributary of Damodar river. A dam on
the upstream site of the nalkari requirement of water. The departments of
industry of the Govt. of Bihar have selected a area nearby on the right bank of
nalkari river for establishing industries. It is an ideal site for setting up
industries.
Climatic condition:-
The
site is situated in the zone of humid climate. Some important meteorological
datas are:
Maximum ambient temperature is 46.30C
Average annual wet bulb amb. Temp. is 20.20C
Maximum humidity is 87%
Average annual rainfall is 50 inches.
Mostly
the wind direction is western & non western.
General
wind velocity at 10m height is 45m/s
Area acquired by P.T.P.S.:-
Area
of 4155 acres land on the left bank of Nalkari river has been acquired for
Power Station, accommodation for staff and other uses. Additional land of 628
acres for ash disposal on the right bank is also in use.
Constructional Details:-
The
whole plant is mainly divided into five parts: water treatment plant, coal
handling unit, steam generator, steam turbine and switch yard, in addition to
these cooling towers are also provided. The administrative block is situated
just beside the plant.
Plant Details:-
Four
units of 50 MW(Russian) each having one boiler and two 100 MW (Russian) units
each having two boiler run in parallel. There is provision to run 100 MW units
at around 50%, capacity with one boiler in service. Also there are four unite
of 110 MW (Indian) having one boiler each. The 50 MW unite have single cylinder
turbine, 100 MW units have double cylinders but 110 MW units have three
cylinders with arrangement for reheating the steam. The turbines and boilers
are installed in conventional system i.e. one boiler is connected to its own
turbine and there is no provision of another interconnected in boilers and
turbines. There is one chimney for exhausting the flue gases for four 50 MW
each and one chimney for two 100 MW each (Russian). Another two chimneys for
four (110 MW each) Indian boilers (one for two boilers). Thus, there are four
chimneys at all having 120m height.
Steam
is generated at high pressure and temperature in the Boilers, which is utilized
to run the turbine at a high speed (3000 rpm). Electric generator is coupled with
the turbine and is rotated by the turbine at the same speed, which result in
generating power. (as magnetized rotor of generator rotates inside the stator
coils.)
Power
is generated at 10.5 KV which is then stepped up to 132 KV in 50 MW units and
10.5 KV/220 KV in 2 X 100MW units of Russian Plant. Power is generated at 11 KV
which is then stepped up to 220 KV. Then these through an autotransformer.
FUEL
OF POWER STATION
1.
Oil :- It is used during standing period to achieve coal
Combustion temp.
Two
types of oil are used:-
(a) L.D.O.
(light diesel oil).
(b) F.O. (furnace
oil).
Properties of L.D.O.:-
(1) Flash point =
660C
(2) C.V. =
10,000 Cal/Kg
Properties of F.O:-
(1) Flash point =
1150C
(2) C.V. =
10,000 Cal/Kg
2.
Coal:-
Coal
is the main fuel used in power house having following proportion:
(1) C.V. =
3610 to 4300 Cal/Kg, 4700 Cal/Kg
(2) Moisture contains 10% to 11%
(3) Sulpher =
00 to 0.40%
(4) Valatyle motter = 20.5% to 34%
(5) fixed carbon = 29.6% to 34%
(6) size =
0 to 10/20 mm
(7) Ash deformation temp. = 12000C
(8) Ash fusion temp. = 13500C
SALIENT DATA
RUSSIAN UNITS (4 X 50 + 2 X 100) MW
(a)
High pressure steam generator (Boiler)
Supplier V/O
Machine Export USSR
Type Type
T – 155
Radiant
Single drum water
Tube
pulverized coal fired boiler.
Rated Output 220
tone/hour
Working pressure 100
atm.
Feed water temp. 2150C
Superheated steam temp. 5400C
(b) Steam Turbine 50MW 100MW
Supplier V/O
Export, V/O Export,
Type K – 50-90 k – 100-90
Casing
Cylinder unit single double
Rated Speed 3000
rpm 3000 rpm
Rated Steam pre. 90
atm. 90 atm.
Rated Steam temp. 5350C 5350C
Rated cooling water 270C 270C
Temperature
(c) Turbo Generator: - 50MW 100MW
Supplier V/O
Export V/O Export
Type TB-602 T TB-1002 T’
Casing
cylinder unit single double
Rated active
power 50 MW 100 MW
Rated
generated 10.5 KV=5% 10.5 KV=5%
Rated power
factor 0.8 lagging 0.8 lagging
Speed 3000 rpm 3000rpm
Frequency 50 Hz 50
Hz
BHEL UNITS (4x110 MW)
(a)
Boilers:
Manufacturer /
Supplier BHEL Tiruchirapalli, Tamil
Nadu,
Radiant, Single drum water tube,
Dry bottom, Pulverized coal fired
Boilers.
Rated output 380 tones/hour
Working
pressure 139 atm
Feed water
Temp. 2400C
Superheated
steam temp. 5400C=5C
(b)
Steam Turbine :-
Manufacture/Supplier NHEL, Hyderabad
Type Three casing, condensing steam
With
Reheating.;
Rated Speed 3000 rpm
Rated steam
Temp. 5350C
Rated cooling
water temp. 300C
(c)
Turbo Generator:-
Manufacturer/Supplier
BHEL, Hyderabad
Type IGH-30.2
Rated active power 110 MW
Rated
generated Voltage 11 KV ± 5%
Rated Current 6560 Amp.
Rated Factor 0.83 lagging
Speed 3000
rpm
Frequency 50 Hz
COAL HANDLING PLANT
There are wide spread belt
conveyor system to feed the raw coal bunkers of the various boilers. The entire
plant consists of three wagon tippler, two crusher hones and a system of
conveyor belts. The plant constructed with extension stage 1 & 2 provided
one wagon and a crusher house having two crushers of capacity 600 tones/hour
each. The plant has been extended with another wagon tifuly and a crusher house
and an additional conveyor system for the 2×100 MW
COAL HANDLING PLANT
The entire
plant at P.T.P.S. is divided into two stations namely station A (Russian Side)
and station B (Indian side) respectively.
Accordingly, there are
2(two) CHP (Coal handling plant) system each one for station A and station B
separately.
(a) CHP for Station
“A” (Russian Side) :-
In CHP system for station A,
there are one wagon tippler two crushers each of capacity 600 T/hr and a net
work of conveyer belts. These equipment are on Russian Design. In this CHP,
there in provision for unloading the coal wagon by wagon tippler. The coal can
be fed to the boiler of unit 1 to 6 directly through coal unloaded from wagons
or through dozing the coal from coal-yard one special provision in this CHP has
been mote to feed the coal to boiler of station “B” also in case of any outage
of the CHP system of station “B” but vice- versa is not provided.
(b) CHP for Station
“B” (Indian Side) :-
There are wide spread belt
conveyor system to feed she red coal bunkers al the various baslens . in CHP
system for station “B” (Indian), there are two wagon tippler, (Qem/s elecon
make, 2nd M/s HEC make for unloading the coal from wagon” A” stacker
and recliner M/s Elecon make has been provided is coal yard to stack and
recliner the coal. One coal crusher house having two coal crusher, capacity 600
T/m each has been provided to crush the the coal. The size al coal from coal
crusher is below 25 m (app) two magnetic separator, one before coal crusher and
other after coal crusher has been provided on conveyor to separate the is on
particles from coal to avoid the damage of equipments.


Tipper No.1 (Station “A)
No.1
No.2
No.1
5
To2B To2A 2 B ……. …..
![]() |
|||
![]() |
|||
|
|
Swing Swing
Feeder
Feeder
W W
W W W
W W W
6ii 6i
5ii 5i 4 3 2 unit no.1
Units constructed in stage 3 extensions.
This plant is being further extended by provision of another wagon tippler and conveyor
system for 2x110 MW units under installation in stage 4 extension.
Coal
received in rail wagon is straight way unloaded on the wagon tripplers and transferred
to raw coal bunkers through a series of conveyor belts. There is also provision
to upload coal on truck hoppers and then to feed by blade feeders as well as by
bulldozing coal to conveyor system in case of non availability of wagon
triplers.
Ash
Disposal Pump House:-
There
are four ash disposal pump in station “A” Russian Side that have been installed
at ash disposal pump house. They are working combined with hydraulic removal of
product of combustion that is slag under boilers and ash under ESP hoppers.
There are crested through three pipe lines of diameter 400 mm. One pipe line is
on working the second one is reserve. They provide to work for four units with
50 MW and two units of 100 MW and with total capacity of 400 MW. In addition,
three flush have been provided for flushing.
Transmission
of Power:-
The
power generated in the station is of 1.5/11 KV and then it is stepped up by
using step-up transformer and fed to the 132/220 KV bus bars. Outgoing 132/220
KV feeders transmit the power to distant places in the state. At the moment
following transmission lines are connected to the 132/220 KV bus bar of the
power station.
(i)
132 KV
feeder to Hatia-I Grid ……………… 2 circuits
(ii)
132 KV
feeders to DVC Patratu (Jindal Previously Basal) transmission line erected but
yet to be commioned on load.
(iii)
132 KV
feeder to DVC Ramgarh –This feeder is utilized for inter connection of DVC grid
with JSEB grid as well as inter trans for of power from JSEB grid to DVC grid
and Vice versa,
(iv)
220 KV
feeder to Hatia-II Grid ……………2 circuits TVNL.
(v)
220 KV
feeders to Tenughat Thermal Power Station) – This line in originally moment for
transmission of 400 KV power but currently it is charged with 220 KV power only.
WATER
TREATMENT PLANT
Water
is an essential part of any power house for electricity generation. In the
Thermal Plant, steam is produced by heating of water and steam passed through
turbine to move the generator for the production of electricity.
To produce steam, pure water is required. But the
water available contains many impurities, which are:-
1.
Un-dissolved
and suspended solid materials like mud, sediment, sand, sodium and potassium
salts, etc. Sometimes iron, manganese or silica are also present.
2.
Dissolved
salts and impurities which include carbonates, bicarbonates, sulphates and
chlorides of calcium and magnesium.
3.
Dissolved
gases such as carbon dioxide and bicarbonates.
4.
Other
materials such as oil, acid, etc.
Therefore presence of the above impurities
may damage the boiler and turbine to a great extent. So it is required to check
the water and make special treatment before using it in the power plant.
In Patratu Thermal Power Station, water is treated in
two stages:-
i)
At the source (Filtration Plant)
ii)
At the plant.
AT THE SOURCE:- In the filtration plant water is treated in
three stages to remove solid particles by mixing alum, chloride and bleaching
powder.
1.
USE OF ALUM:- Firstly, water is stored in the water tank. Water
contains muddy particles. When the alum is dissolved the muddy particles being
heavy settle at the bottom and the fresh water is collected.
2.
BY USE OF BLEACHING POWDER:- After collection of the fresh water,
bleaching powder is used for the extraction of bacteria.
3.
BY USE OF CHLORINE:- Water is passed through the chlorine layer
which results in removal of oil or acidic particles.
After this, the collected water reaches the
“Chemical Water Treatment Plant”
(C.W.T.P.). Here, it goes through various processes discussed below:-
1.
Stored
in the raw water tank. The starting of CWTP.
2.
Passed
through M.G.T. (Multi Grade Filter), by
the help of feed pumps. There are 2 feed pumps present at P.T.P.S. one feed pump
is working and the other is kept reserve for emergency. In this process sand
particles are extracted and the sand free water is collected.
3.
Filtration
through A.C.F. (Activated Carbon
Filter):- In this process organic carbon is removed.
4.
Filtration by C.E. (Cation Exchanger):-After passing through A.C.F. water is
passed through C.E. this process removes all the acidic particles in water.
5.
Use of Degasser:-Here the reaction gases produced after
passing through the cation exchanger are releases into the atmosphere.
6.
Filtration
by A.E. (Anion Exchanger):- By passing through the anion exchanger, mixed salts
which are present in the water are removed. The anion resin used in P.T.P.S.
C.W.T.P. is FFI. This is a complex polymer compound which contains free ions.
7.
M.B. (Mixed Bed):- It is also called ion separator. In this,
two layers are formed, one of cation and the other of anion. Due to light
weight anion is collected at the upper part and the heavy cation ions are
collected at the bottom part.
After all these processes, water is
collected in the D.M.W.T (De-Mineralized
Water Tank).
TEST OF WATER
Before feeding the water in to boiler, the
de-mineralized water is tested for satisfaction.
De-mineralized water should have the following
specifications:-
Hardness - Nil
Silica - Less than 0.02ppm
Conductivity - Less
than 1 μ/cm.
PH value - 7
COAL
HANDLING PLANT
Coal delivery equipment is one of the
major components of plant cost.
Coal handling
consists of the following steps:-
1.
Coal
delivery
2.
Weighing
and measuring
3.
Unloading
4.
Preparation
5.
Transfer
(Conveyor)
6.
Storage
(Yard)
7.
Implant
Handling
8.
Crushing
and Pulverizing
9.
Feeding
the coal into furnace
NOTE:- The coal storage capacity of the plant is
3,00,000 tones and the feeding capacity is 500 tones/hr.
The source of coal is Khalari and Barkakana
QUALITY OF COAL
1.
Grade
of Coal: E.F.
2.
Calorific
value of coal: 4000 K cal/kg.
3.
Ash
content of the coal: 41%=?
EQUPMENTS USED:-
1.
Wagon
tippler:- Unloading capacity is 500 tones/hr.
2.
Swing
feeder
3.
Traveling
Tripler
4.
Reclaim
hopper
5.
Vibrator
feeder
6.
Magnetic
drum
7.
Belt
scales
8.
Belt
Feeders
9.
Crushers
10.
Bunker
hopper
11.
RC
Bunker
Power supplied to conveyor : 0.4KV/440V
Material Used : Nylon (6 ply)
Width : 1200mm
Top cover : 3.15mm
Bottom cover : 1.50mm
Grade : m24
For the generation of steam, we used coal in large
amount. It is fossil fuels. Coal is Classified as:-
*Peat *Lignite *Bituminous and
*Anthracite
The man features of coal handling are:
1.
Russian
400MW, Indian 440MW
2.
To
know the calorific value (required fire as steam used)
3.
To
Crush large size Raw coal into small size (25mm)
4.
To
remove impurities & provide good flame to boiler.
Main Parts:-
1.
Wagon Tippler:- It is a
set of motor, gearbox, railway bogey. It
helps in unloading.
2.
Bunker Hopper:- Bunker Hopper, in which there are square
holes so that large size coal don’t pass to conveyor.
3.
B.F. (Belt Feeder):- Help to carry this coal.
4. Conveyor:- Set of belt of different sizes it is used
to carry coal from one place to another .
5. Crusher:- To crush or break the coal into 25mm size.
6. RCH (Reclaim hopper) +
Swing feeder (SF):- To
send coal to yard to swing feeder with the help of Bull Dozer.
Fixed Tippler A&B
Plough Feeder
Blade Feeder (BF)
2. Traveling Tippler:- For
every conveyor two tippler give to bunker coal on both side as requirement.
RC Bunker:- Raw
Coal bunker.
TST (Telescopic Tube):- Yard
PROCEDURE:-
1. Loading coal with the help of cranes in the
wagon machine.
2. By wagon pusher, bring it on the railway
track, near the wagon tippler set.
3. Form Bunker Hopper, coal carried (by
filtering of large size coal) with the help of conveyor (belt feeder). It may
be underground or aboveground.
4. Through conveyor at crushers. The crusher
the coal into 40mm size.
5. From crusher. It carries on to ball mill
and from ball mill in it goes to pulverize coal bunker inform of
6. From storing bunker, some big size comes
back in ball milling (36 ton steel ball present), through suction vacuum pipe
it goes to PC Bunker (Pulverized coal Bunker.)
PROTECTION:-
a)
At the
time of bringing in Wagon tippler, few water is mixed/sprayed into coal, so
that the dust. May be absorbed.
b)
Do
wait till bulb gets OFF, otherwise coal will be remains in boggy.
c)
Grease
& oil should be given in bearing properly.
STEAM
BOILER
IN
the Thermal Power Plant steam is the first necessary source to generate the
Electricity. Equipment used for the production of steam is boiler. In boiler
water is heated up to certain temperature to get steam. Steam thus generated by
boiler passes through super heaters, and from there to turbine, it again sent
into the boiler in case of re-heater boiler.
# BOILER
DISTRUBUTION AT P.T.P.S.
PART
– I
RUSSIAN
UNIT
PHASE – I PHASE
– II
For 50 MW units For 100 MW units
Unit number 1 to 4 Unit number 5 & 6
4 x 1 2
x 1
4 boilers 2
boilers
One boiler for each there are two boilers for each
50 MW units’ 100 MW units
Total number of boilers in Russian unit =
08
PART
–II
INDIAN
UNIT
For 110 MW units
Unit number 7 to 10
4 x 1 = 4 boilers
One boiler for each 110 MW units
Total number of boiler in Indian unit = 4
RANKINE CYCLE GRAPH
DEAETATOR GRAPH
MAIN
PARTS OF BOILER:-
1. BOILER DRUM: - It is stock of water which is situated at
the top of the furnace. The shape of the boiler is spherical and Dimensions
used in P.T.P.S or the boiler drum is spherical and plate of 97mm nominal
thickness has an outside diameter, of 1800mm. the drum is of fusion welded
design with welded on semispherical dished ends. The drum dished ends are
provided with manholes and manhole covers. The long urinal and circumferential
welds are properly annealed and X-rayed during manufacture. The drum is
provided with stubs for welding, on all connecting tubes such as down comer
tubes, return tubes, saturated steam outlet. Tubes feed water inlet tubes etc.
Length :- 15000 mm
Diameter :- 1800 mm
Capacity of drum
:- 70
tones/hr.
Thickness :- 97 mm
2.
ROUGH MOUNTINGS:- These consist of access doors into the combustion chamber, regions of super heaters,
economizers and air heaters, as well as observation port, explosion doors,
dampers in flue gas ducts, etc. the rough mounting are made of cast iron or are
of fabricated design depending upon the
location and their purposes.
3.
WATER WALLIS:- Inside the furnace there
is a large number of vertical tubes for the production of steam. All the tubes
are connected with bottom header by which water flows inside the tube and very
nearer to each other when water is heated. Misture of steam and water in
produced which goes to boiler drum through up risers steam water is separated.
4.
AIR PREHEATER:- Air pre-heater is a
equipment used for heating the passing air before reaching the boiler furnace.
5.
SUPER HEATER:- By the super heater, we
get superheated team with very high temperature. Superheaters are placed in the
boiler furnace upper parts.
6.
REHEATERS:- Repeaters are used to
increase the temperature of steam.(outlet H.P. cylinder of turbines is boiler
for reuse (fed to M.P. cylinder of turbine).
AUXILARIES:-
1. P.A FAN (Primary Air Fan) :- It is used for carrying
pulverized coal dust from p.c. system to combustion chamber. Two primary fans
are used for each unit at P.T.P.S.
2.
SEPARATOR:- It is used in separate the
course particles of coal from vapour/air coal mixture.
3.
CYCLONE:- Function of cyclone in to
separate the coal dust and vapour/air.
After, combustion
coal charged in to ash and slag come in to bottom hopper from there it is
removed by slag conveyer in to ash slurry disposal system.
4. INDUCED DRAUGHT FAN:- Induced draught
fan is used for evacuating flue gases through the chimney.
5. FORCED DRAUGHT FAN:- Forced draught fan used for given air for combustion to boiler.
6. CONDENSATE PUMP:- It is used for pumping the condensate water of hot well in feed water storage track
decorator.
7. BOILER FEED PUMP:- Bolder feed pump is used for water supply into
the boiler.
In the PATRATU
THERMAL POWER STATION
2. no. of boiler feed pump is used (one is
reserved and one is working with one boiler.)
8. CIRCULATING WATER PUMP:- By the use of circulating water pump, we
pass the cold water which is used generator.
(i) Cooling of steam in
condenser coming from final stage of turbine.
(ii) Cooling the H2 gas
in the generator
(iii) Cooling the bearing of
different auxiliaries.
9. COAL FEEDERS:- For feeding the pulverized coal inside the furnace
in control quantity.
10. MILL PLANT:- It is used for
pulvorising coal
For Stn. A-36MT Ball is used
(Stage 1+2)
For Stn. B-52MT
Ball is used (Stage 3)
For Stn. B-Bowl mills are used
(Stage 4)
Size of Ball- Ф 40MM,
Ф 50MM, Ф 60MM
Now day chromium ball
are used to increase efficiency of mills.
SPECIFICATIONS OF BOILER:-
1. FOR
50 MW UNITS:-
Rated output - 220 t/hr.
Working pressure in boiler drum – 115 atm.
Working pressure at main valve outlet – 100
atm.
Feed water temperature – 215oC
Superheated steam temperature - 540 oC
Place of boiler – 32 Mtrs.
2. FOR 110 MW UNITS:-
Rated output – 375 t/hr.
Working
pressure in boiler drum – 146 Kg/m2.
Working
pressure at main valve outlet – 139 atm.
Feed
water temperature - 240oC (after HPH “1”)
Superheated
steam temperature - 540 oC
Hight
of boiler – 42 Mtrs.
Feed
water temp in After economisor = 318 oC
OTHER
DIMENSIONS:-
1.
Internal dimension of furnace chamber – 7160 x 9792
mm
2.
Internal diameter of boiler drum– 1600 mm, pitch –
64mm
3.
Diameter of furnace chamber – 8.26 m
Tubes made of steel sheets
of 22k grade, 89 mm thickness
TYPES
OF SUPERHEATERS USED:-
Station ‘A’ Station
‘B’
1. Ceiling
superheater – I Wall
Super Heater
2. Ceiling
superheater – II Ceiling
Super Heater
3. Platen
superheater Low
temp super Heater
4. Convective
superheater – I Platen
Super Heater
5. Convective
superheater – II Final
Super Heater
Convection
Super Heater
TUBE
LEAKAGE PROBLEMS:- It
is the main problem in the boiler arising due to the following factors:-
1. High
temperature inside the furnace.
2. Chocking
due to salt accumulation.
3. High
slaging factor.
4. Furnace
explosion.
5. Furnace
draft high/low.
6. Lower
Quality of steam flow Extension-III
Station
‘B’:-
There are 16 nos. of P.C burners and 12
nos. of Vapour burners (Tangentially fired).
There are 4 nos. of oil burners (side
fired)
Nos.
of Equipments in each boilers:-
1. ID Fans 2
Nos.
2. FD Fans 2
Nos.
3. P.A Fans 2 Nos.
4. Ball Mills 3 Nos.
5. Vapour Fans 3 Nos.
6. P.C Feeders 16 Nos.
7. R. C Feeders 3 Nos.
8. Slag Crushers 4 Nos.
INTERLOCK AND PROTECTION OF BOILER
Boiler
will trip if
1.
Both F.D. Fans. Trip
2.
Furnace draft reaches +
40 mm wc
3.
Boiler drum level high (+ 200
mm)
4.
Boiler drum level low (- 200
mm)
5.
Both ID Fans trip.
6.
If Turbine trips
7.
If Generator trips
Boiler
should be tripped if
1.
If all P.C. Feeders trip.
2.
If both P.A. Fans trip.
3.
If there is no fire in
furnace
STEAM
TURBINE
(RUSSAINUNIT & INDIAN
UNIT)
The 110
MW condensing steam turbine is designed
directly coupling with Hydrogen cooled generator. The steam turbine is
designated for operation with live steam ate 146ata pressure and 535-5400C temperature as measured before the entry into the
turbine emergency stop valve. The steam turbine has three cylinder mixed blades
with a wheel Curtis at the governing stage and 8 pressure stages is H.P.
cylinder. The turbine is divided into three parts:-
1.
H.P.-High
Pressure
2.
M.P.-
Medium Pressure
3.
L.P.-
Low pressure
After each pressure section in the steam
turbine, bearings are connected. Due to this, movement of the rotor of turbine
is easy.
PRINIPLE:- There are two parts of a turbine:-p
1.
Stator
Part
2.
Rotor
Part
The blades of the turbine make some angle
with the shaft. Due to injection of steam, rotor is rotating and a generator is
directly coupled with the steam turbine shaft. Rotational energy of the turbine
shaft is directly transferred to the rotor of generator and after rotation,
electricity is produced in P.T.P.S.
WORKING:-
At the
starting position, steam is firstly injected in the medium pressure cylinder of
the turbine. Before this operation, by the bearing gear, we give some rotation
(approx. 63rpm),
This is operated electrically. Due to injection we at
steam in M.P. turbine, raise the speed of turbine rotor up to 500rpm. After
this operation, main steam line stop valve is opened which is operated at the
H.P. Cylinder side. After rotation, the steam pressure is constant but
temperature decreases. So again the extracted is sent to boiler for reheating
steam and is in to M.P. Cylinder. Before again injecting after this operation,
steam is injected to the L.P. Cylinder section.
Turbine rotor is flexible one with having following
critical speed. H.P. Turbine- 2355rpm M.P. & L.P. turbine-1900-2200rpm.
STEAM EXTRACTION:-
The
steam turbine has five outlet steam extraction pipe for the extraction of
steam. Pipes are insulated with thermosetting materials.
For feed water heating upto 2180C before
going to economizer coal in the boiler. In this process consumption of ste am
is approx 25T/hr. Besides, steam upto 7
T/hr. is used for heating up deareator from 2nd or 3rd
extraction line steam.
DIFFERENTIAL EXPANSION:-
H.P.-(-) 1.5mm to 3.5mm
M.P.-(-) 1.5mm to 3.5m
L.P.-(-) 2.0mm TO 4.0mm
AXIAL SHIFT DISPLACEMENT: +/-
0.62mm
H.P.
total Expansion- 25mm
DIFFERENTIAL TEMPERATURE:-
H.P. Top/Bottom
H.P.
Top/Flange -100Cto
500C in normal running
Condition.
M.P.
Top/Bottom Maximum during
rolling: - 700C
M.P.
Top/Flange
GOVERNING PARAMENTERS:-
1. Opening
of Interceptor valve - 0.8kg/cm2 of sec.
Oil
Pressure.
2. Opening
of Gov. Valve 1&2 - 1.05kg/cm2 of sec.
Oil
Pressure.
3. Opening
of Gov. Valve 3 - 1.78kg/cm2 of sec.
Oil
Pressure.
4. Opening
of Gov. Valve 4 - 2.8kg/cm2 of sec.
Oil
Pressure.
5. Full
opening of I.V. (L&R) - 2.8kg/cm2 of sec.
Oil
Pressure.
6. Full
opening of Gov. (1&2) - 2.9kg/cm2 of sec.
Oil
Pressure.
7. Full
opening of Gov. (3) - 2.3kg/cm2 of sec.
Oil
Pressure.
110MW BHEL UNITS
Main Technical Data for
Two Turbo sets of 110MW
BSIC PARAMETERS:-
1.
Rated
output measured at the terminals for the generator 110MW.
2.
Economical
output=95MW.
3.
Rated
speed= 3000 rpm
4.
Rated
pressure of steam just before stop valve=130 atm.
5.
Rated
temperature of steam just before stop valve= 5350C.
6.
Max.
Pressure of steam just before the stop valve= 146atm.
7.
Max.
Temp. of steam just before the stop valve= 5450C
8.
Rate
pressure before medium pressure casing= 3163 ata.
9.
Rated
Temp. before medium pressure casing = 5350C
10.
Max.
Pressure before M.P. casing = 35 atm.
11.
Max
temp. before M.P. casing= 5450C
SYSTEM OF THE TURBINE (110
MW)
1.
4
control valve+2 interceptor valves
H.P. cylinder:- 2 rows of curtis wheel+8 action wheel
2.
Medium
pressure cylinder:- 12 action wheels.
Weight of M.P. cylinder;- 11000kg. (approx)
3.
Low
pressure cylinder:
-4 action wheel of double flow
Weight of low pressure rotor (approx):- 4000kgs.
Direction of the turbine rotation
looking from the
front bearing pedestal:- Clock wise
Rotors rotate at
62rpm on bearing gears.
Number of
non-regulated extractions=8
GOVERNMING
REGULATING
AND SAFETY EQUIPMENT OF THE TURBINE
The
quantity of steam entering the turbine is regulated by means of four governing
valves (GV) on the inlet to the H.P. part and by two interceptor valves (IV) on
the M.P. part. The amount of opening at any instant of these valves is given by
the pressure of secondary oil, which is indirectly dependent on the primary oil
pressure and directly dependent upon the spring force in the
transformer. The pressure of the primary oil is directly dependent upon
the speed of the set through the speed-sensing element. The tension of the
spring in the transformer can be varied by the speed changer and by that
it is possible to vary the speed before synchronizing and to vary the load
after synchronizing the alternator with the grid.
The
non-uniformity of the regulation can be changed continuously in the range of 3
to 5.5% by the means of non-uniformly changer (NUC) and by that the proportion
of change of output of the set can be influenced with respect to the other
machines connected to the common gird when there is a change on loading on
grid.
SOME DESIGNED PARAMETERS
1.
Main
Steam:-
Pressure- 130kg/cm2
Temp- 5350C+50C
Flow-
365T/hr
2.
Cold
reheat steam:
Pressure- 35kg/cm2
Temp- 3690C
Flow-
360T/hr
3.
Hot
regeat steam:
Pressure- 33kg/cm2
Temp- 5400C+50C
Flow-
313T/hr
Numbers of equipments in:
1. Boiler feed pump 2
Nos.
2. Condensate pump 3
Nos.
3. Circulation water pump 3 Nos.
4. Starting oil pump 2
Nos.
5. A. C Emergency oil pump 1 No
6. D. C Emergency oil pump 1 Nos.
7. L. P Heaters 5
Nos.
8. H.P Heaters 2
Nos.
INTERLOCK
AND PROTECTION OF TURBINE
Turbine will trip automatically if:-
1.
Condenser
vacuum drops to ( - ) 0.5 Kg/cm2
2.
Control
oil pressure drops to 7.0 Kg/cm2
3.
Lub.
Oil pressure drops to .08 Kg/cm2
4.
Axial
shift becomes + .065mm.
5.
Primary
oil pressure become .05 Kg/cm2
6.
If
boiler trips.
7.
If
generator trips.
Turbine should
be tripped if:-
a.
There
is increase of high vibration or some metallic sound.
b.
Sudden
entering of water in turbine resulting cooling os some turbine parts.
c.
Return
bearing oil temperature reaches 700 C.
d.
Temperature
of bearing Babbitt metal reaches, 850 C.
e.
If all
condensate pumps trip.
f.
If all
C. W. Pumps trip.
g.
The
Temperature of main steam/hot re- heat steam inc/dec max/min value.
GENERATOR
INTRODUCTION:-
Alternators
(A.C. generator) are also known as synchronous generator. Its main
function is to convert mechanical power from a prime mover to electric power at
a specific voltage and frequency.
Large generators are used to generate bulk power at
thermal, hydroelectric and nuclear power stations.
3-phase synchronize generators are used in3-phase
generation, transmission & distribution.
A)
STATOR:-
Stationary part, comes the armature winding
in which voltage is generated i.e. output is taken from stator.
YOKE (frame): Cast iron for small machine and welded
steel for large machine.
CORE: Assembled with high grade silicon content
steel lamination to reduce iron losses.
STATOR WINDING: A 3-phase winding puts in the slot
in stat connection.
B)
ROTOR:-
*Salient pole rotor *cylindrical rotor
Rotor is a rotating part, which produces the main
field flux in which supply is given through d.c. generator calledencitor. in PTPS
cylindrical rotor is used.
1.
Slots
are at regular intervals & parallel to the shaft on which d.c. field winding occurs.
2.
Rotor
is smoother machine, makes less winding losses & the operation is less
noisy (due to uniform air gap).
3.
Cylinder
rotor is two or four pole type alternator, which provides greater mechanical
strength & permits more accurate balancing.
4.
It is
driven by steam or gas turbine i.e. turbo generator or turbo.
D.C. EXCITER:-
Excitation
means production of flux by passing current in the field winding (rotor)
from d.c.
generator. As a rotor has no more residual magnetism, so first of all to make
it electromagnetic i.e. dc is supplied to the rotor through brushes and slip
ring.
PRINCIPLE-VOLTAGE
GENERATION:-
A prime
mover (machine) supplies the mechanical energy input to the alternator i.e.
steam cuts turbine or gas turbine. Actually, armature conductor on the stator,
the field flux of the rotor & voltage is generated.
AVR (Automatic Voltage
Regulator)
· It
controls the system voltage with alternator.
· If any fault in the system to increase the
excitation for maximum synchronizing.
· Automatic Voltage regulation at the time of
sudder cha of load/loss of load on the system.
Scheme Diagram:-
Field
winding of Rotor Alternator
F) SYNCHRONISM CASE:-
1.
Frequency-
supply frequency & grid frequency should be matched.
2.
Voltage-
Generated voltage & System voltage should be matched.
3.
Phase
sequence- Matching phase sequence (i.e. positive phase sequence) it
should be at 60deg. either lagging or leading.
G) PROTECTION (ELECTRICAL):-
I. Negative phase sequence
relay
II. Phase to phase fault.
III.
Phase
to earth.
IV.
A)
Over fluxing b) over current and c) over load d) over balanced load.
V.
Loss
of excitation (Current power)
VI.
Anti-motoring
(Failure of Prime Mover).
MOTORING
1.
Prime
Mover
2.
AVR
3.
Generator
INDUCTION MOTOR:-
a)
Prime
Mover (Turbine)- Fails (trip)
b)
Excitation- Zero (field breaker trips)
c)
Generator Breaker- ON
Then the generator will act as Induction
Motor. In case as motoring.
SUNCRONOUS MOTOR:-
a) Prime
Mover (Turbine) - fails (trips)
b) Excitation-
Zero (field breaker trips)
c) Generator
Breaker- ON
Then the generator will act as Induction
Motor. In case as motoring.
TRANSFORMER
Transformer
is a static device, which transfers electric power from one circuit to another
circuit at const. Power, and frequency. These are two types of
transformer
1.
Step
up transformer:- Low voltage to High voltage.
2.
Step
down Transformer:- High Voltage to low voltage.
There are mainly two parts of transformer:-
1.
External
Parts.
2.
Internal
Parts.
OBSERVATION:-
TRANSFORMER
a) Parts b)
Interconnection c) Damage d)
Protection e) Application
Internal
External
1) Internal
Parts:- a) Coil (Winding)
b) Core (Silicon Steel Sheet)
c) Oil (Mineral oil/Porcelain oil)
a) Coil:- In the power transformer there are two types of winding
(wire).
I) Round
winding:- For small Transformer
II) Flatted
winding:- (Copper) for large transformer.
In
the winding there are two types of connection:
·
Star
Connection Secondary side
·
Delta
Connection Primary side
``
In actual, winding are:-
Single winding- Auto transformer
Double winding- Double magnetic Circuit
Three winding- Three phase transformer
b) Core- It is made of silicon steel sheet laminated
with insulation (mica, porcelain oil etc.)
c) Oil- In the transformer mineral oil is filled in the
oil tank. Its main function
# cooling of winding Due to movement of oil
#
Insulating.
2) External
Parts:-
a)
Oil
tank (trans. Body)
b)
Conservator
c)
Radiator
(Oil pump fan)
d)
Breather
(Lungs)
e)
Explosion
vent or PRV (Pressure release valve)
f)
Tap
changer
g)
Bushing
(LV ,HV,MV)
h)
Buchoize
Relay
i)
Thermo
signaliser
j)
CT
& PT
k)
Aux.
Transformer
l)
Earthling
Bus bar
I)
Oil tanker:- Body of the transformer (Ferro Magnetic material) in
which mineral oil is filled up.
II)
Conservator:- Conservator is a cylindrical hollow tank & it is
connected with transformer body.
It acts on oil reservoir to maintain the
level of oil in the transformer. When it is on “Load” and on “No load” in
either care.
III)
Radiator:- Radiator is used for natural cooling of oil. For
cooling of Radiator internal fan and oil pump is used oil pump circulates the
oil & distributed in diff. section of radiator to keep coal.
IV)
Breather:- It is
connected to conservator. Its main function is to remove moisture in air
ingress through pump. Oil layer goes up & down during this incident making
a chance of introduction moisture air in oil, which is harmful to insulator
& transformer oil (Acidic). It contains silica gel.
V)
Explosion vent (Whistle)- It is connected over the transformer, it
forms high gas. If I gets no way to exit, it will come out with explosion i.e.
to gets blast and break the Bakelite foil, it has diaphragm made up of bakelite
foil or aluminum foil.
Nowadays instead of explosion
vent, PRV (Pressure release valve) is used i.e. to release gas as pressure
increases
VI)
Tap Changer:- Tap changer is
connected to secondary winding transformer. It contains no. of contact points
(winding) of different voltage and operated manually.
In the PTPS nine, five,
seventeen steps tap changer are used to maintain the voltage level of
transformer tap changer may work in different modes i.e. on load, off load
& Auto load.
VII) Bushing:- Bushing is a type of insulator situated
at the top of transformer body. Its main function is to introduce flux or
electrical connection from power transformer to switch yard.
VIII) Bucholze
Relay:- It is a gas
detector relay used to protect transformer from minor fault and heavy fault.
Any types of fault or short circuited or sudden damage in insulator, oil of the
tanks gets over heated and gases formed It is connected.
It is used for larm. The up
& Down in oil level disturbs the equilibrium of the gas flouts no mercury
will come in first contact and a signal arrived in the control room either an
alarm or a glowing bulb.
Further it large volume of
gas generated again equilibrium will disturb and mercury comes in second
contact i.e. closed and transformer will trip.
IX)
Thermo Signalizer:- It is used for measuring temperature. It
contains
* Stem- Methyl chloride gas is filled.
* Capillary tube:- It is covered by PVC. In
capillary tube methyl. Chloride gas is also filled it is made up of copper. It
has combination of four small size bulbs. Its n needle pointers, when tempt
will increase contact their no signalizer make contact at 650C and
tripped the transformer.
* In the upper piping of the transformer.
The ups and down in the oil level due to formation of gas. Disturbs the mercury
equilibrium in the relay and the 1st enunciation (alarm) comes.
X)
CT and PT:- Both are instruments. CT is used to measure current at
rated voltage. It is used in switched yard. For one phase one CT is used. It is
also used as protective device.
#PT is used to measure
voltage at rated current. It is used in plant near the connection and generator
and bus bar i.e. situated at bus bat.
XI)
Auxiliary Transformer:- Two aux. transformer of rating (7.5MVA)
are connected to provide power supply in unit.
XII) Earth
(Grounding):- Tow purpose
of earth
a)
To
earth, any electrical leakage goes to ground (Zero potential) otherwise current
will conduct in all body of transformer and a chance shock.
b)
Helps
in phase test.
XIII) Bus
bar:- It is solid
materials made of copper. It is aluminum size 10mm (large for HV). It helps in
connecting switches and other equipment of power transmission.
#Main bus bar measuring
instrument, relay etc. associated with it
# Transfer bus (aux. bus)
used for connecting feeder or equipment (Selector or transfer switch)
b) Interconnection:- Star connection
(Secondary Side)
Delta
Connection (Primary Side)
c)
Damage:-
1) Due to movement in oil it will be heated
and damage the insulating material.
2) Up & Down in oil level in the
conservator, a moisture air is introduced and makes oil acidic.
d)
Protection:-
1) Winding should be insulated.
2) Cooling of winding is necessary.
3) Output should be taken with the help of Bushing.
4) Earth is necessary otherwise shocked.
5) Fan & oil pump is used to keep cool radiator.
6) Foil in diaphragm is of bakelite (Should be blasted).
e)
Applications:-
d)
Use in
communication and electronic system (Transformer will amplifier)
e)
Generator
transformer used in plant.
f)
Distribution
transformer used for industrial used.
g)
To
match source and load for maximum power transfer.
1. Generator
transformer 11T
Capacity
60MVA
Voltage
ratio 10.5/33/132KV
Auxiliary
transformer 21T
Capacity 7.5MVA
Voltage
ratio 10.5/6.6KV
Unit
transformer 41T
Capacity
320KVA
Voltage
ratio 6.6/0.4KV
2. Generator
transformer 12T
Capacity
60MVA
Voltage
ratio 10.5/33/132KV
Auxiliary
transformer 22T
Capacity 7.5MVA
Voltage
ratio 10.5/6.6KV
Unit
transformer 42T
Capacity
320KVA
Voltage
ratio 6.6/0.4KV
3. Generator
transformer 13T
Capacity
60MVA
Voltage
ratio 10.5/33/132KV
Auxiliary
transformer 23T
Capacity 7.5MVA
Voltage
ratio 10.5/6.6KV
Unit
transformer 43T
Capacity
320KVA
Voltage
ratio 6.6/0.4KV
4. Generator
transformer 14T
Capacity
60MVA
Voltage
ratio 10.5/33/132KV
Auxiliary
transformer 24T
Capacity 7.5MVA
Voltage
ratio 10.5/6.6KV
Unit
transformer 44T
Capacity
320KVA
Voltage
ratio 6.6/0.4KV
5. Generator
transformer 15T
Capacity
125MVA
Voltage
ratio 10.5/33/220KV
Auxiliary
transformer 25T, 26T
Capacity 7.5MVA
Voltage
ratio 10.5/6.6KV
Unit
transformer 45T,
46T
Capacity
320KVA
Voltage
ratio 6.6/0.4KV
6. Generator
transformer 16T
Capacity
125MVA
Voltage
ratio 10.5/33/220KV
Auxiliary
transformer 27T, 28T
Capacity 7.5MVA
Voltage
ratio 10.5/6.6KV
Unit
transformer 47T,
48T
Capacity
320KVA
Voltage
ratio 6.6/0.4KV
SWITCH-YARD
The main function of Switch-yard is:-
¯ It makes available the generated power at plant to the people.
¯ Power generated transmitted via Switch-Yard
¯ To protect the plant due to sudden damage happening
Outside the
plant.
Switch – yard scheme (in PTPS)
1 to 10 Units PTPS 132KV
Hatia- I
1 to 4-50 MW
……… Hatia –II
Russian
5 to 6-100 MW PTPS 220KV
Hatai –I
7 to 10-110 MW- Indian(BHEL) ………
Chandil
PTPS (Outgoing feeders)
1. a)
132KV Ramgarh
(D.V.C.) 5C
b) 132KV BASL
(Jindal) 6C
2. a)
132KV Hatai-I
grid 8C
b) 132KV Hatia-I
grid 9C
(Line
Hatia-I)
3. a)
220KV Hatia-I
grid 1b
(Line
Hatia-I)
b) 220KV Hatia-I
grid 2b
4. 400KV/220KV
TTPS (TVNL)
P.T.P.S.
In the PTPS switch yard the main
equipment in installed are as.
LA Lightening Arrester
CT Current transformer
PT Potential transformer
Autotransformer
Insulator
Bus
Bushing
Wave trap
1) Lightening Arrester (LA):-
As
overload voltage is enclosed transmission line due to lightening, so the main
function of LA is to divert the incoming high voltage for round i.e. earthed
this HV, the HV is due to lashing thundering sky.
2) CT:-
It is a
protective device, which measures the current at
rated voltage.
®
It has one turn of primary
winding i.e. the conductor of the ckt. It self formed the primary of the CT.
®
Rating of Ct is very small i.e.
15VA and more exists to 30 VA. The heavy current is used to be measured without
breaking the current ckt. With the help of CT.
Few data of CT
used at PTPS:-
Turn Ratio 1200/1
A
Frequency
50Hz.
Voltage
240KV
Capacity
26.4KVA
3) PT (Potential Transformer):-
It is also a protective device used to measure the voltage.
Used
for voltages above 380V.
It
has more turns is primary and less turns in secondary so
that potential
is reduced to measure the voltage by using low
capacity
voltmeter.
Each phase of
the system has different PT
One such data of
PT at P.T.P.S. :-
Rated Burden 400/600 Va
Voltage Ratio 220KV/110V
(measurement)
4)
Auto Transformer:-
(i)
There are two auto transformer
used in switch yard (Auto T1, Auto T2)
(ii)
Main function it primary side generation is low and demand on secondary
is high. Then autotransformer will maintain is from other side generation with
no loss of power and vice- versa.
Rating – 150MVA, 120MW
5) Circuit Breaker:- There are four types of CB in Patratu Thermal Power Station:
I) OCB (Oil Circuit Breaker)
II) VCB (Vacuum circuit Breaker)
III)
ABCD (Air Blast Ckt. Breaker)
IV)
SF6 (Sulpher haxa Fluoride gas
ckt. Breaker)
CB is a Protective device acts as a
switch
but the main difference between breaker
and switch, switch having no any protection i.e. manually On/Off, but in case
of CB it has a protection device like Relay.
FUCTIONS:-
¯ To make & break the
normal operating current.
¯ To open & close on load.
Principal:-
It has two coils namely closing coal and tripping
coal and spring charging mechanism
which may either be
charged by motor (spring charging
motor) or manually by
manual operating handle.
By
charging closing coil (Electrical Supply
in given to coil), the breaker may be mode
“ON” by
Local/remote switch
similarly by emerging tripping coil
(Electric supply
given to coil) we may make the breaker
“OFF” by local/remote
switch or the breaker may trip on
Protection such as
earth fault/ over current in the transmission line by it self.
¯ Current coil made up of copper.
¯ SF6-SF gas is used to burn off the spark.
¯ ABCD _ Air used to burn off arc extinguisher.
¯ OBC – Oil used to burn off the sparking, takes place
due to
heating oil.
6) Isolator:-
¯ It is a disconnection switch and to be
operated on
load not (When
circuit breaker is in closed position)
¯ It is necessary to facilitate mainul work on
transmission
line & circuit breaker.
7) Bus:-
ª BUS is a system, witch helps in is transmission of voltage as per
availability and requirement.
« At PATRATU THERMAL POWER STATION in 33KV switchyard – two Buses are
used to charge the station transformer and also used to supply the power to the
Patratu Thermal Power Station
¬ In 132 KV switchyard three buses is used for same purpose.
8) Bushing:-
It is a type of insulator and design above 2000amp.
Through it terminal should be taken out for transmission i.e.
protect to shock.
9) Wave Trap:-
¬ wave trap is an equipment installed in
Switch yard for telecommunication on line.
¬ It has a coupling capacitor i.e. trap the communication among
P.T.P.S. grid and substation connected to it.
FIRE & SAFETY
Sources of Fire
The main source of fire in
any industry are electricity, smoking, friction, over heating material, hot
surfaces, burner flame ignition cutting ad welding, mechanical spark, static
spark and other sources asa exposure, the extent to which the industrial fire
is caused by this sources which has been shown as under:
Electricity
32%
Smoking
09%
Friction
10%
Hot surfaces 15%
Burner Flame 06%
Spontaneous Ignition 05%
Cutting and welding 09%
Mechanical Spark 02%
Static Spark 02%
Others 10%
Total 100%
Cause of Fire
1.
Cutting
& welding
2.
Heat/
over heat
3.
Elec.
Arc/Spark, Elec. Short circuit
4.
Metal
Spark
5.
Loco
Spark
6.
Mechanical
Fault
7.
Spontaneous
Combustion
8.
Static
Electricity
9.
Improper
Quenching
10.
Friction
11.
Open
Flame
12.
Not
Known
13.
Miscellaneous
and others
Important
fire haards in thermal power station
1.
Boiler
a) Accumulation of coal dust
b) Air pre hearts
c) Fuel oil
d) Rejected coal from coal
mills
2.
Turbine
a) Oil leakages from bearings
b) Oil leakages from Sealings
c) Oil leakages from
Governing system
d) Oil leakages from jacking
system Etc.
3.
Generator
a) Leakage of
b) Exciter sliperings
4.
Oil Facility
a) Fuel oil in tanks
b) Oil splashes mear oil
transfer pump & motors
c) Oil splashes in tunnels
5.
Coal handling plant
a) Spontaneous fire in coal
heaps
b) Coal dust
c) Conveyor belts
d) Mobable equipments
6.
Hydrogen plant
a) Electric Equipments
7.
Switch yard
a) Transformers
b) Breakers
c) CT/PT
8.
Transformers/Breakers/Cables
a) Generator transformers
b) Unit aux transformers
c) Switch gear rooms
d) Cable galleries
FIRE
PROTECTION
To reduce to loss of fire is FIRE PROTECTION.
Fire Protection is a planned approach to the provision
of adequate structural safe guard against the possibility of fire speard and
the availability of fixed and portable appliances which will readily available
in emergency.
The protection is done by various type of system.
FIRE
PROTECTION SYSTEM:-
System which are used to reduce the loss of fire is
FIRE PROTECTION system.
FIRE PROTECTION system.
There are two types of Fire Protection System
1. Active System.
2. Passive System.
ACTIVE
FIRE PROTECTION SYSTEM
As their name indicte that the systems which are
operated automatically in case of fire ate Active Fire Protection system
1. Sprinkler System
2. Mulsifyre System
3. CO2 injection System
4. Smoke Detection System
clubbed with total flooding system of any extinguishing agent.
5. Automatic Modulars.
6. fire resisting Coating for
H.T. Cables.
PASSIVE FIRE
PROTECTION SYSTEM
The systems which are operated manually in case of
fire to reduce fire loss are PASSIVE FIRE PROTECTION SYSTEM.
1. Smoke Detection System.
2. Heat Detectors.
3. Booster Pump System.
4. Landing Valves.
5. Hydrant System.
6. Dry Riser System.
7. Foam Pourers.
8. Hydrant Ring main
9. Deluge System.
10. First Aid Fire Fighting
Equipment.
11. Static Tank Water Spray
System.


Comments
Post a Comment